£120,366
Aircraft Location:Orlando, Florida, USA
Údaje o prodejci
View Seller InformationGeneral
Rok
2002
Výrobce
Model
Stav
Použité
FlightRules
IFR
Popis
2002 Piper Arrow PA 28R-201
Lycoming IO360C1C6
Airframe Total Time: 3487
Engine SFRM: 1874
Prop SMOH: 655
ELT 11/2027
IFR Cert 4/2028
Full digital logs available upon request
Hangered at KFMY & KORL
Avionics
Audio Panel: Garmin 340
Nav/Comm: (2) Garmin GNS 430W
Transponder: GTX 345
Autopilot: STEC 55X
HSI: BENDIX KING KCS-55A
CDI: GARMIN GI 106
Extensively maintained and upgraded over the last 3 years with over $60K invested! Excellent compression and engine oil analysis, no damage, no corrosion and factory AC. Lowered price - Relocating west and upgrading to a turbo. Flown regularly throughout the southeast, absolutely no squawks. Recent annual completed (4/2026), Full digital logs available. Maintained with open checkbook by Bill Turley at Aircraft Engineering (KBOW).
2026 Annual: AC clutch, spark plugs, new battery, all brake & gear hydraulic hoses
2025 Annual: new alternator, new magnetos, new fuel pump, ELT, new gear horn, new tires/tubes, brake master cylinders & park brake
2024 Annual: electric trim switch, Whelen LED wing lights, cowling oil door replacement, nose gear cylinder, muffler,
2023 Vacuum pump, new glareshield
Avionics Repair/Replacement:
Attitude Indicator Replacement: (5/2023)
GNS 430W Garmin Factory Reman (6/2023)
HSI Replacement: KG 102A GYRO (5/2024)
GNS 430W Rebuild (3/2026)
Airframe
Total Time
3,487
Motor
Engine 1 Make/Model
LYCOMING
Engine 1 Time
1,874 SFRM
Engine TBO
2000
Props
Prop Time
655 SMOH
Avionics
Avionics/Radios
Audio Panel: Garmin 340
Nav/Comm: (2) Garmin GNS 430W
Transponder: GTX 345
Autopilot: STEC 55X
HSI: BENDIX KING KCS-55A
CDI: GARMIN GI 106

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

