£929,645
1/4 Fractional Ownership:
Call For Availability
Aircraft Location:Vancouver, British Columbia, Kanada
Údaje o prodejci
View Seller InformationGeneral
Rok
2006
Výrobce
Model
Sériové číslo
4636365
Stav
Použité
Registration #
CGNOH
FlightRules
IFR
Based at
CZBB
Popis
Available Fractional Ownership unit sizes
Airframe
Total Time
2,156
Range
1,200 Nm
Max Ramp Weight
1,976.76 kg
Max Takeoff Weight
1,950.45 kg
Max Landing Weight
1,870.16 kg
Max Zero Fuel Weight
1,870.16 kg
Basic Empty Weight
1,411.58 kg
Useful Load
565.18 kg
Fuel Capacity Mass
481.72 kg
Fuel Capacity Volume
574.63 L
Complete Logs
Ano
Engine 1
Engine 1 Make/Model
PRATT & WHITNEY
Engine 1 Time
1,068 SNEW
Engine 1 TBO
4000
Engine 1 Cycles Since Overhaul
1,164
Props
Prop 1 Manufacturer
HARTZELL
Prop 1 Model
HC-E4N-3M
Prop 1 Time
80 SMOH
Number of Blades
4
Swept Blade Propellers
Ano
Avionics
Multi-Function Display 1 Manufacturer
GARMIN
Multi-Function Display 1 Model
G500
GPS 1 Manufacturer
GARMIN
GPS 1 Model
GTN 750XI
GPS 2 Manufacturer
GARMIN
GPS 2 Model
GTN 650XI
Transponder 1 Manufacturer
GARMIN
Transponder 1 Model
GTX330ES
Transponder 2 Manufacturer
GARMIN
Transponder 2 Model
GTX330ES
Autopilot Manufacturer
S-TEC
Autopilot Model
SYSTEM 55X + AUTOTRIM
ADS-B Equipped
Ano
FANS
Ano
WAAS
Ano
LPV
Ano
SVT
Ano
CPDLC
Ano
Avionics/Radios
Sam2 standby module by MCIBendix King KMD 850 Shadin ETM
Additional Equipment
Pressurized
Ano
Oxygen System
0.62 m3
Flight Into Known Icing (FIKI)
Ano
Inadvertent Ice Protection
Ano
Exterior
Year Painted
2006
Interior
Year Interior
2006
Number of Seats
6
Configuration
Passenger
Inspection Status
Inspection Status
Annual Inspection Completed June 3rd 2026 with TC Approved Maintenance Schedule
Airworthy
Ano

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

