£316,909
Aircraft Location:Allen, Texas, USA
Údaje o prodejci
View Seller InformationGeneral
Rok
2006
Výrobce
Model
Stav
Použité
Popis
Beautiful Robinson R44 Raven II with no damage history and excellent recent maintenance history. The aircraft completed its 12-year inspection in July 2020, with the next 12-year inspection due in 2032. Approximately 1,290 hours remain until the next 12-year inspection.
Well equipped with air conditioning, bubble windows, Garmin 430W GPS/NAV/COM, King KY196, Garmin GTX 335 ADS-B Out, 4-place intercom, digital attitude indicator, 205-1B directional gyro, and turn coordinator.
All applicable ADs and SBs have been complied with, and the most recent 100-hour/Annual inspection was completed in February 2026.
A well-maintained and nicely equipped R44 Raven II with strong remaining inspection time, modern avionics, and no damage history.
Ready for its next owner!
Airframe
Total Time
3,100
Max Takeoff Weight
1,133.98 kg
Basic Empty Weight
680.39 kg
Useful Load
453.59 kg
Fuel Capacity Volume
189.27 L
Crash-Resistant Fuel System
Ano
Complete Logs
Ano
Robinson Overhaul
Ano
Rotor
Main Rotor Blade Time Remaining
1290
Motor
Engine 1 Make/Model
LYCOMING IO-540-AE1A5
Koňská síla
193.88 kW
Engine 1 Time
910 SMOH
Avionics
Flight Deck Manufacturer/Model
GARMIN GNS430W
ADS-B Equipped
Ano
Artificial Horizon
Ano
Avionics/Radios
- Garmin 430w
- King KY196
- Garmin 335 ADSB out
- 4 place intercom
- Digital attitude indicator
Additional Equipment
Air Conditioning
Ano
Additional Equipment
- Air conditioning
- Bubble windows
- 205 - 1B Directional gyro
- Turn coordinator
Interior
Year Interior
2006
Bubble Windows
Ano
Inspection Status
Inspection Status
Last 100hr / Annual completed Feb 2026
Airworthy
Ano

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

