£105,128
Aircraft Location:Madison, Wisconsin, USA
Údaje o prodejci
View Seller InformationGeneral
Rok
1962
Výrobce
Model
Sériové číslo
18254183
Registration #
N3183Y
Stav
Použité
FlightRules
IFR
Popis
Well maintained, flown regularly, and oil changes on a factory new engine every 4 months or 25 hours. Overhauled mags, new wiring harness and spark plugs are just a few of the new parts added in the last couple of years. WAAS Garmin panel for those IFR days and ADSB in/out transponder for traffic and weather to your iPad. This turn-key Skylane does have some minor damage history from the 1960's that was repaired at an authorized repair facility with new parts from Cessna. No hail damage and no corrosion. All logs since new on this Anniversary edition Skylane. Headed in for fresh Annual in October 2026.
Airframe
Total Time
4,745
Complete Logs
Ano
Airframe
Horton STOL craft kit installed
Motor
Engine 1 Time
995 SNEW
Engine TBO
2000
Props
Prop Time
325 SMOH
Modifications/Conversions
Vortex Generators
Ano
Modifications/Conversions
Horton STOL craft kit with new wing tip, leading edges, aileron, and flap gap seals
Avionics
Flight Deck Manufacturer/Model
GARMIN GNS430W
Transponder 1 Manufacturer
APPAREO
Transponder 1 Model
STRATUS ESG
ADS-B Equipped
Ano
WAAS
Ano
LPV
Ano
Engine Monitor
Ano
Exterior
Exterior
Shows well. Leading edges painted in 2018.
Interior
Year Interior
2007
Number of Seats
4
Configuration
Passenger
Interior
Airtex interior installed in 2007. In very nice shape. No tears or stains.
Inspection Status
Inspection Status
Sold with fresh Annual being completed in OCT 2026, IFT pitot static and transponder check completed June 2025
Airworthy
Ano

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

