£212,472
£212,472 + GST = GBP £233,720 (GST applies to buyers in Australien)
Standort des Flugzeugs:Perth, Western Australia, Australien
Verkäuferinformation
Verkäufer-Informationen anzeigenAllgemein
Jahr
1978
Hersteller
Modell
Seriennummer
E-1383
Registration #
VH-BQA
Zustand
Gebraucht
FlightRules
IFR
Based at
Perth. Western Australia
Beschreibung
1978 Bonanza A36 with turbo-normalised IO-520 engine, Garmin G3X avionics, Garmin autopilot and navigators. Tornado Alley 6 place oxygen system, Tornado Alley Tip tanks. Location is Jandakot, Western Australia. The owner of this Bonanza has spent $A220k on avionics and performance upgrades and it can cruise at 195 TAS at FL 180. This aircraft provides a lot of capability at the right price.
Flugzeuggestell
Total Time
2,889
Complete Logs
Ja
Motor
Engine 1 Make/Model
CONTINENTAL IO520
Leistung
212.52 kW
Engine 1 Time
1,236 SMOH
Engine TBO
1700
Aftermarket Engine STC
Ja
Turbo normalized
Ja
Ausstattung
Propeller-Zeit
58 SNEW
Anzahl der Messer
3
Modifications/Conversions
Modifications/Conversions
Turbo normalised via a system from Tornado Alley fitted 2021. TAS 195 knots at FL180.
Tip Tanks by Tornado Alley
• New tinted windows all round with thickened material for reduced noise in 2020
• GAMI injectors
• New propeller June 2022 Hartzell True Composite 3 blade
• Tornado Alley 6 place O2 system
Luftfahrtelektronik
Flight Deck Manufacturer/Model
GARMIN G3X
ADS-B Equipped
Ja
WAAS
Ja
LPV
Ja
Gierdämpfer
Ja
Avionics/Radios
o G3X,
o GTN650,
o GFC507 autopilot,
o GTX345 transponder,
o GMA 345 audio panel
o G5,
o GTR225
o Codan HF2000 radio,
Zusätzliche Ausrüstung
Oxygen System
Ja
Additional Equipment
Tornado Alley 6 place oxygen system
Innenausstattung
Number of Seats
6
Configuration
Passenger

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

