Preis auf Anfrage
Standort des Flugzeugs:Brookville, Ohio, USA
Verkäuferinformation
Verkäufer-Informationen anzeigenPARKER AIRCRAFT SALES
Kontakt:JEFF PARKER
Telefon:+1 937-833-4820
Brookville, Ohio, USA
Allgemein
Jahr
1979
Hersteller
Modell
Seriennummer
7952190
Registration #
N111UC
Zustand
Gebraucht
Beschreibung
7205 TT, 398/690 SMOH, 398/690 SPOH, Part 135, GNS530, EX500, Altimatic X, Panther winglets, Known ice, Cargo door, Air, VG’s, 8 pax leather
Flugzeuggestell
Total Time
7,205
Complete Logs
Ja
Airframe
Part 135 operated and maintained the last 15 years-excellent detailed maintenance
All logs since new
Engine 1
Engine 1 Time
690 SOH
Engine 1 TBO
1800
Engine(s)
690 Since Left Engine Overhaul by Airmark in 2019
Engine 2
Engine 2 Time
398 SOH
Engine 2 TBO
1800
Engine 2 Notes
398 Since Right Engine Overhaul by Certified Engines in 2021
Ausstattung
Propeller 1-Zeit
690 SOH
Propeller 2-Zeit
398 SOH
Prop Specs
690 Since Left Prop Overhaul in 2019
398 Since right Prop Overhaul in 2021
Luftfahrtelektronik
Avionics/Radios
Garmin GNS530 IFR GPS/Color Moving Map/NAV/COM
Collins VHF251 COM
Collins VIR351 NAV
Garmin GTX345 Transponder with ADS-B out
Collins 451 DME
Radar Altimeter
Avidyne Flightmax EX500 MFD
Altimatic X Autopilot/Flight Director/Slaved HSI
Zusätzliche Ausrüstung
Additional Equipment
Panther Winglets, Known ice, Cargo door, Air conditioning, Vortex generators, Oxygen, Cleveland brakes, Ground clearance, Co-pilot instruments, Windshield wiper, USB ports.
Außenseite
Exterior Notes
Paint is White with Sandalwood and Red, Burgundy and Black trim.
Innenausstattung
Interior Notes
The interior is Beige leather with potty and pull-out tables. 8 seats total

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

