Preis auf Anfrage
Standort des Flugzeugs:Kinston, North Carolina, USA
Verkäuferinformation
Verkäufer-Informationen anzeigenAllgemein
Jahr
2001
Hersteller
Modell
Seriennummer
560-5186
Registration #
N836JS
Zustand
Gebraucht
Based at
KISO
Beschreibung
The airframe has 12,256 hours, the engines respectively have 2,685 hours and 6,278 hours Since New with hot section inspections recently completed on both. Engines are enrolled on PowerAdvantage.
Flugzeuggestell
Total Time
12,256
Total Landings
9,285
Maintenance Tracking
FLightDocs
Engine Program
Engine 1 Maintenance Program
PowerAdvantage
Engine 1
Engine 1 Make/Model
PRATT & WHITNEY PW545A
Engine 1 Serial Number
DB0782
Engine 1 Time
2,685 SNEW
Engine 1 TBO
5500
Engine 1 Cycles Since Overhaul
1,653
Engine 1 Notes
fresh HSI completed 3/26
Engine 2
Engine 2 Make/Model
PRATT & WHITNEY PW545A
Engine 2 Serial Number
DB0764
Engine 2 Time
6,278 SNEW
Engine 2 TBO
5500
Engine 2 Cycles Since Overhaul
4,902
Engine 2 Notes
fresh HSI completed 11/25
Auxiliary Power Unit
APU
Ja
APU Time
4,441
APU Maintenance Program
Aux Advantage
Luftfahrtelektronik
Flight Deck Manufacturer/Model
HONEYWELL PRIMUS 1000
Zusätzliche Ausrüstung
Wifi
Ja
Additional Equipment
ATG-2000
Außenseite
Year Painted
2019
Exterior
Overall Matterhorn White base with Dark Blue Metallic and Titanium Metallic Stripes. Paint completed 5/2019
Innenausstattung
Year Interior
2022
Number of Seats
9
Galley
Ja
Galley Configuration
Forward
Lavatory
Ja
Lavatory Configuration
Aft
Interior
Nine (9) passenger cabin seating featuring color Moon Stone diamond stitched leather seats. Storm side panels, PSU and window panels in Icicle Exceleather. Blue Galaxy carpeting. Taupe sheep skin crew seats with Storm leather side panels. Full refurb completion 11/2022.

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

