Preis auf Anfrage
Standort des Flugzeugs:Raleigh, North Carolina, USA
Verkäuferinformation
Verkäufer-Informationen anzeigenAllgemein
Jahr
2006
Hersteller
Modell
Seriennummer
258770
Zustand
Gebraucht
Beschreibung
Engines Enrolled on MSP
APU Enrolled on MSP
Flight Data Recorder (88 Parameters)
Pro Line 21
6 + 1 Passenger Configuration
No Damage History
Flugzeuggestell
Total Time
6,785
Total Landings
4,809
Airframe
Entry into Service Date May 2006
Engine Program
Engine 1 Maintenance Program
MSP
Engine 1
Engine 1 Time
4,962 SNEW
Engine 1 Cycles Since Overhaul
4,795
Engine 1 Notes
Honeywell TFE731-5BR
Engine 2
Engine 2 Time
5,065 SNEW
Engine 2 Cycles Since Overhaul
4,883
Engine 2 Notes
Honeywell TFE731-5BR
Auxiliary Power Unit
APU
Ja
APU Notes
Description Honeywell GTCP36-150
APU Total Time Since New 8,550 Hours
Program Coverage MSP
Luftfahrtelektronik
Avionics/Radios
The Beechcraft Hawker 800XP is equipped with an integrated, Rockwell Collins Pro Line 21 avionics suite.
Zusätzliche Ausrüstung
Additional Equipment
Belted Lavatory
Flight Data Recorder (88 Parameters)
Pro Line 21
Dual FMS
ADS-B
RVSM
Außenseite
Exterior
Base Paint Color White
Stripe Colors Light Grey & Dark Grey
Last Painted Date 2021
Innenausstattung
Interior
Number of Passengers Six (6) + One (1)
Galley Location Forward
Forward Cabin Configuration Four (4) Place Club
Aft Cabin Configuration Two (2) Forward Facing Seats
Lavatory Location Aft (Belted Lav)
Jumseat Yes
Last Refurbished Date 2021
Prüfstatus
Inspection Status
Inspection Last Performed Next Due
12 Month April 2025 April 2026
24 Month September 2024 September 2026
48 Month September 2022 September 2026
Landing Gear Overhaul October 2014 October 2026 / 6,932 Cycles

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

