£538,879
Standort des Flugzeugs:Hanau Am Main, Hessen, Deutschland
Verkäuferinformation
Verkäufer-Informationen anzeigenAllgemein
Jahr
2009
Hersteller
Modell
Zustand
Gebraucht
Registration #
D-GCUP
FlightRules
IFR
Based at
EDMA
Beschreibung
625.000€ ex VAT
Private DA42-NG aircraft maintenance by Diamond Air Egelsbach always maintained in PART 145 workshop.
Available for pre buy inspection in Europe
ALWAYS HANGARED
No damage history
Flugzeuggestell
Total Time
1,940
Max Takeoff Weight
1,900 kg
Basic Empty Weight
1,449 kg
Useful Load
422.67 kg
Engine 1
Engine 1 Make/Model
AUSTRO E4
Engine 1 Serial Number
E4-B-06153
Engine 1 Time
165 SOH
Engine 1 TBO
1800
Engine 2
Engine 2 Make/Model
AUSTRO E4
Engine 2 Serial Number
E4-B-06154
Engine 2 Time
165 SOH
Engine 2 TBO
1800
Ausstattung
Prop 1 Manufacturer
MT
Prop 1 Model
MTV-6-R-C-F/CF187-129
Propeller 1-Zeit
945 SOH
Prop 2 Manufacturer
MT
Prop 2 Model
MTV-6-R-C-F/CF187-129
Propeller 2-Zeit
945 SOH
Anzahl der Messer
3
Luftfahrtelektronik
Flight Deck Manufacturer/Model
GARMIN G1000
Avionics/Radios
GARMIN G1000 with Synthetic Vision, Chart View, SafeTaxi, Terrain Warning System
GARMIN GFC700 Autopilot with Yaw Damper
GSR56 Iridium Sat Link and Phone
GTX345R ADSB In+Out Transponder (installed 2024)
Avidyne TAS-610 Traffic Advisory System (linked to GTX345R)
WAAS / LPV
Stormscope WX-500
Becker ADF Receiver
KN63 DME
Zusätzliche Ausrüstung
Additional Equipment
TKS De-Ice
Portable Oxygen System Mountain High
Außenseite
Exterior Notes
Exterior in good condition
Innenausstattung
Interior Notes
Interior in good condition
Black interior.
Prüfstatus
Inspection Status
Inspection will be renewed before sale
ARC will be renewed before sale
Airworthy
Ja

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

