£1,004,264
Standort des Flugzeugs:Fort Lauderdale, Florida, USA
Verkäuferinformation
Verkäufer-Informationen anzeigenAllgemein
Jahr
2025
Hersteller
Modell
Seriennummer
50CAA079
Registration #
N59RG
Zustand
Gebraucht
Based at
KTYR
Beschreibung
Upgrade your mission profile with this meticulously equipped DA50 RG. N59RG is a sleek, modern masterpiece that’s ramp-ready and engineered to turn heads at every altitude.Aircraft is covered under factory warranty until June, 2027!
Flugzeuggestell
Total Time
140
Motor
Engine 1 Time
140 SNEW
Engine TBO
2000
Ausstattung
Propeller-Zeit
140 SNEW
Luftfahrtelektronik
Avionics/Radios
Integrated Garmin G1000 NXi Glass Panel Cockpit including:
2x Garmin GDU 105 x 10-Inch Flight Display (PFD and MFD)
Garmin GEA 71B Airframe / Engine Interface Unit
2x Garmin GIA 64 W COM / NAV / SBAS-GPS / GS / LOC
Garmin GMA 1360 Digital Audio System
Garmin GRS 79 Attitude Heading Reference System
Garmin GDC 72 Digital Air Data Computer
Garmin GMU 44 Magnetometer
Garmin GFC 700 Automatic Flight Control System
including Yaw Damper
Garmin GTX 345R ADS-B “In“/“Out“ Transponder
Garmin ChartView Approach Plates (Subscription required)
ELT 406 MHz
Digital Standby Attitude Module (MD-302 SAM)
Zusätzliche Ausrüstung
Additional Equipment
Air Conditioning / RACC System
TKS De-icing System
Oxygen System
Garmin Flight Stream 510
Garmin GCU 476 Keypad (Flight Management System)
Garmin Synthetic Vision Technology (SVT)
Außenseite
Exterior
Diamond Premium Interior in Dark Gray with Blue stitching
Innenausstattung
Interior
Diamond Premium Metallic paint in Anthracite over black with blue striping
Prüfstatus
Inspection Status
Annual: Will deliver with Fresh Annual

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

