£2,055,021
Standort des Flugzeugs:Fort Lauderdale, Florida, USA
Verkäuferinformation
Verkäufer-Informationen anzeigenAllgemein
Jahr
2002
Hersteller
Modell
Zustand
Gebraucht
Beschreibung
2002 King Air C90B Excellent condition and options:
CAMP maintenance tracking program enrolled
All logbooks available and up to date
Flugzeuggestell
Total Time
3,613.5
Total Landings
2,970
Landing Gear Overhaul
Ja
Engine Program
Engine 1 Maintenance Program
Andere
Engine(s)
Engines are enrolled on MORE STC
Engine 1
Engine 1 Make/Model
PRATT & WHITNEY PT6A-21
Engine 1 Serial Number
PCE-PE0420
Engine 1 Time
3,613 SNEW
Engine 1 TBO
8000
Engine 1 Cycles Since Overhaul
2,970
Engine 2
Engine 2 Make/Model
PRATT & WHITNEY PT6A-21
Engine 2 Serial Number
PCE-PE0428
Engine 2 Time
3,613 SNEW
Engine 2 TBO
8000
Engine 2 Cycles Since Overhaul
2,970
Ausstattung
Prop 1 Manufacturer
RAISBECK
Prop Specs
Raisbeck propellers STC
Luftfahrtelektronik
Avionics/Radios
GARMIN 1000
Garmin GDU 1040ª
Garmin GDU 1500
Garmin GCU 475
Garmin GMA 1347D
Garmin GIA 63W
Garmin GRS 77
Garmin GDC 74A
Garmin GMU 44
Garmin GEA 71
Garmin GFC 700
Garmin GTX 33D
Garmin GWX 68
Zusätzliche Ausrüstung
Additional Equipment
Cleveland brakes
MTOW increased to 10.500lb
Raisbeck propellers STC
Raisbeck wing baggage lockers
Außenseite
Exterior
Condition: 9/10
Innenausstattung
Number of Seats
6
Lavatory
Ja
Interior
6 passenger seating
Double club
Belted lav.
Single seat on door entrance
Condition: 9/10
Modifications/Conversions
Wing Locker System
Ja
Modifications/Conversions
Raisbeck wing baggage lockers
Prüfstatus
Inspection Status
Propellers OVH – Dec 2024
Landing gear OVH – Dec 2025
All logbooks available and up to date
NO KNOWN DAMAGE HISTORY
Maintenance Tracking Program: CAMP
Airworthy
Ja

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

