Preis auf Anfrage
Standort des Flugzeugs:São Paulo, São Paulo, Brasilien
Verkäuferinformation
Verkäufer-Informationen anzeigenAllgemein
Jahr
2014
Hersteller
Modell
Seriennummer
45-472
Registration #
PP-FTX
Zustand
Gebraucht
Beschreibung
Aircraft based and registered in Brazil.
All maintenance current controlled by CAMP.
Fresh 72mo inspection and PPI.
Engines and APU enrolled on MSP.
Equipped w/ Garmin G5000 Suite, ADS-B, SVS and CVR.
Executive interior configured for 9 passengers + 2 pilots.
No accident or incident history and always kept in hangar.
Sold to current owner by Global Aircraft.
Flugzeuggestell
Total Time
2,925
Engine Program
Engine 1 Maintenance Program
MSP
Engine 1
Engine 1 Make/Model
HONEYWELL TFE731-40BR
Engine 1 Time
2,925 SNEW
Engine 1 TBO
7000
Engine 2
Engine 2 Make/Model
HONEYWELL TFE731-40BR
Engine 2 Time
2,925 SNEW
Engine 2 TBO
7000
Auxiliary Power Unit
APU
Ja
APU Time
1,375
APU Maintenance Program
MSP
APU Notes
HONEYWELL RE100
Luftfahrtelektronik
Avionics/Radios
Bombardier Vision Flight Deck – Garmin G5000
EFIS - Triple Garmin GDU1400W
PFD/MFD /EFIS Displays
FMS - Dual Garmin GTC 570
SVS - Garmin Integrated
Transponder- Dual Garmin GTX3000 w/ ADS-B Out
ADC - Dual Garmin GDC7 400
NAV / COM- Dual Garmin GIA 63W GPS w/ WAAS
RADAR-Garmin GWX70
DME -Rockwell Collins DME-4000
TCAS - Garmin GTS8000 TCAS II v.1/ Ch. 7.1
RAD ALT - Rockwell Collins AL T-4000
SAT WX - Garmin GSR 56
ELT - Artex C406-N; 406 MHz ELT
CVR - FA2100
AHRS - Dual GRS 7800
Innenausstattung
Interior
Executive interior configured for 9 passengers + 2 pilots.
Prüfstatus
Inspection Status
All maintenance current controlled by CAMP.
Fresh 72mo inspection and PPI.
Airworthy
Ja

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

