£228,128
Standort des Flugzeugs:Birmingham, Michigan, USA
Verkäuferinformation
Verkäufer-Informationen anzeigenAllgemein
Jahr
2019
Hersteller
Modell
Registration #
N140MP
Zustand
Gebraucht
FlightRules
IFR
Based at
KPTK
Total Time
475
Number of Seats
2
Beschreibung
Logbooks Available upon request
Pristine condition Vans RV-14. Synergy build assist. No damage history.
No trades or brokers.
Flugzeuggestell
Airframe
Grove brakes (2025)
Goodyear PN: 505C61-8 tires/tubes 2025
JD Air Tailwheel
Aircraft Performance braided stainless brake lines
Heated Pitot with Angle of Attack
Skybolts on upper cowl
Motor
Engine 1 Time
475 SNEW
Engine(s)
Lycoming Thunderbolt YIO-390-A3B6-rated at 218 HP
Dual P-mags Model P114L4 with backup power
Earth-X battery
Christen Inverted Oil kit
Ausstattung
Prop Specs
Harzell Constant Speed C2YR-1BFP/F7497-2
Luftfahrtelektronik
ADS-B Equipped
Ja
Avionics/Radios
Dual Dynon Skyview HDX1000 Monitors with back up batteries-Emergency Smart Glide
Synthetic Vision and Moving Map
Advanced Flight System Panel
A/P with Altitude Pre-Select and Altitude Hold
Dynon AFS Control Panel
Avidyne IFD 540 WAAS GPS Navigator with Nav/Comm
Dynon Comm 2
Dynon Transponder SV-261 with ADSB/B Dual band receiver
PS Engineering Audio Panel-PDA 360
Dual ADHARS
Dual Alternators
Zusätzliche Ausrüstung
Additional Equipment
Bruces canopy cover
Bogert tow bar
Canopy Sunshade
Jet Shades
Außenseite
Exterior
Professiona 4 color metallic paint with Ceramic coating
Full LED Exterior Lighting, Landing and Position light
Year Painted
2019
Innenausstattung
Interior
Classic Aero Custom Leather Interior and Carpet
Hooker harness 5 point system
Year Interior
2019
Prüfstatus
Inspection Status
Due end of July 2026

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

