Alle(15)
£82,015
Standort des Flugzeugs:Santa Ana, California, USA
Verkäuferinformation
Verkäufer-Informationen anzeigenOC Aircraft Sales
Kontakt:Gary Sequeira
Telefon:(949) 922-5263
Newport Beach, California, USA
Allgemein
Jahr
1975
Hersteller
Modell
Seriennummer
177RG-0673
Registration #
N2726V
Zustand
Gebraucht
FlightRules
IFR
Based at
KSNA (John Wayne)
Flugzeuggestell
Total Time
4,064
Max Takeoff Weight
1,270.06 kg
Fuel Capacity Volume
227.12 L
Complete Logs
Ja
Airframe
Complete and Original Logs Since New. No major Damage History Noted.
Motor
Engine 1 Make/Model
LYCOMING IO-360-A1B6D
Engine 1 Time
1,556 SFOH
Engine TBO
2000
Engine(s)
Engine removed and reinstalled in 2010 for metal contamination, with 910 SFOH. 646 Hours ago.
Ausstattung
Prop Manufacturer
MCCAULEY
Prop Model
B2D34C207
Propeller-Zeit
178 SMOH
Anzahl der Messer
2
Klingenzusammensetzung
Aluminium
Prop Specs
Fresh Overhaul 2018
Luftfahrtelektronik
ADS-B Equipped
Ja
Motoranzeige/Motorüberwachung
Ja
Avionics/Radios
Narco Mark 12D Nav/Com
ARC 300 Nav/Com System
Dual Glideslope
Garmin GNX 375 GPS Transponder System
King KN 61 DME (Inop)
Digital EGT System
Digital Fuel Flow System
Digital Avtron M800 Chronometer
4 Place intercom system
3LMB
Zusätzliche Ausrüstung
Additional Equipment
Rosen Visors
Wing Tip Strobes
Precise Flight Standby Vacuum system
Door Steward Mod
LED Taxi and Landing Light Mods
Upgraded Monarch Fuel Caps
Außenseite
Year Painted
1992
Exterior
Overall White/2 Tone Orange trim. Overall good, with some Chipping.
Innenausstattung
Number of Seats
4
Configuration
Passenger
Interior
Tan Vinyl. Very good Condition.
Prüfstatus
Inspection Status
Fresh Annual June, 2026.
Airworthy
Ja
Serviceprotokoll

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

