£41,529
Standort des Flugzeugs:Stayner, Ontario, Kanada
Verkäuferinformation
Verkäufer-Informationen anzeigenAPEX AIRCRAFT SALES LTD
Kontakt:Madison Furgala
Telefon:+1 416-389-1917
Breslau, Ontario, Kanada
Allgemein
Jahr
1977
Hersteller
Modell
Seriennummer
28-7716191
Registration #
C-GQJS
Zustand
Gebraucht
Based at
CNY3
Beschreibung
1977 Piper PA-28-161 Warrior II with 4,521.9 hours total time. Powered by a Lycoming O-320-D3G. The aircraft completed its annual inspection in July 2026 with extensive recent maintenance in preparation for sale. Engine condition checks at the annual included compressions of 74/75/74/77, borescope inspection, and oil-filter inspection with no concerning metal noted. The fixed-pitch Sensenich propeller received its Canadian 5-year inspection in July 2026.
Flugzeuggestell
Total Time
4,521.9
Complete Logs
Ja
Airframe
Complete logs back to 1977
Motor
Engine 1 Make/Model
LYCOMING O-320-D3G
Leistung
119.31 kW
Engine 1 Time
2,528.3 SMOH
Engine TBO
2000
Jahr in dem Motor überholt oder neu installiert wurde
1980
Engine(s)
July 2026 annual: compressions 74/75/74/77 over 80; borescope inspection completed; oil filter inspected with no concerning metal noted. Recent work also included engine mount / induction / exhaust-related maintenance.
Ausstattung
Prop Manufacturer
SENSENICH
Prop Model
74DM6-0-60
Propeller-Zeit
1665
Prop Specs
5-year propeller inspection completed July 2026
Luftfahrtelektronik
Avionics/Radios
Dual Garmin GTR 225 COM radios
PS Engineering PMA6000 audio panel
Außenseite
Exterior
Paint is in very good shape 8.5/10
Innenausstattung
Interior
Interior is in very good shape 8.5/10
Prüfstatus
Inspection Status
July 2026
Airworthy
Ja
Serviceprotokoll

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

