£244,047
Standort des Flugzeugs:Addison, Texas, USA
Verkäuferinformation
Verkäufer-Informationen anzeigenAllgemein
Jahr
1976
Hersteller
Modell
Seriennummer
TH-720
Registration #
N112PC
Zustand
Gebraucht
FlightRules
IFR
Based at
KADS
Beschreibung
More photos coming soon!
Well-equipped Baron 58 featuring mid-time engines, a Garmin GDU 620/G600 display, S-TEC 55X autopilot, additional Garmin avionics, and an upgraded air-conditioning system. Fresh annual completed June 2026.
A clean, capable Baron with desirable upgrades and excellent cross-country capability.
Contact Lone Star Aircraft Sales for complete specs, times, photos, and pricing.
Flugzeuggestell
Total Time
10,018
Range
1,200 Nm
Max Takeoff Weight
2,449.4 kg
Fuel Capacity Volume
537.53 L
Complete Logs
Ja
Engine 1
Engine 1 Make/Model
CONTINENTAL TSIO520C7BN
Engine 1 Horsepower
212.52 kW
Engine 1 Time
758 SMOH
Engine 1 TBO
1900
Engine 2
Engine 2 Make/Model
CONTINENTAL TSIO520C7BN
Engine 2 Horsepower
212.52 kW
Engine 2 Time
901 SMOH
Engine 2 TBO
1900
Ausstattung
Prop 1 Manufacturer
HARTZELL
Prop 2 Manufacturer
HARTZELL
Anzahl der Messer
3
Klingenzusammensetzung
Aluminium
Modifications/Conversions
Modifications/Conversions
Air Conditioning
Luftfahrtelektronik
Flight Deck Manufacturer/Model
GARMIN GDU 620
GPS 1 Hersteller
GARMIN
GPS 1 Modell
GNS530W
Transponder 1 Hersteller
BENDIX/KING
Transponder 1 Modell
KX155
Transponder 2 Hersteller
GARMIN
Transponder 2 Modell
GTX327
Autopilot-Hersteller
S-TEC
Autopilot-Modell
SYSTEM 55X
WAAS
Ja
SVT
Ja
Gierdämpfer
Ja
Aktiver Verkehr
Ja
Zusätzliche Ausrüstung
Schutz gegen überraschende Vereisung
Ja
Klimaanlage
Ja
Prüfstatus
Inspection Status
Annual Completed 06/2026
Airworthy
Ja

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

