£217,576
Standort des Flugzeugs:Lexington, Kentucky, USA
Verkäuferinformation
Verkäufer-Informationen anzeigenAllgemein
Jahr
2006
Hersteller
Modell
Seriennummer
1618
Registration #
N792CD
Zustand
Gebraucht
Beschreibung
Whether you are chasing your certificates or just looking for an easy-to-fly cross-country aircraft, N792CD can do it for you. This G2 SR20 offers incredible value with only 1,740 hours on the airframe and only 265 hours on a factory-new engine. Along with these low hours, you get a highly upgraded avionics stack as well as a recent parachute repack. Skip the downtime and choose the option that is ready to go!
Located in Lexington, KY, at KLEX
Complete and Consecutive Logbooks
No Damage History
Parachute Line Cutters done 1/26
Parachute Repack done 4/26
Flugzeuggestell
Total Time
1,740
Airframe
1740 Hours TT
Motor
Engine 1 Time
265 SNEW
Engine TBO
2000
Engine(s)
265 Hours SNEW
Continental IO-360
Ausstattung
Prop Specs
265 Hours SPOH
3-Blade Hartzell Prop
Luftfahrtelektronik
Avionics/Radios
Avidyne Entegra EX5000C (PFD)
AvidyneEntegra EX5000C (MFD)
Avidyne IFD440 GPS/NAV/COM (x2)
Avydine DFC90 Autopilot
Garmin GTX 345 Transponder (ADSB In & Out)
PS Engineering Audio Panel 450B
CMAX Chart View Electronic Approach Plates
E TAWS Enhanced Terrain Avoidance System
EMAX Engine and Fuel Monitoring
Zusätzliche Ausrüstung
Additional Equipment
Cirrus Airframe Parachute System (CAPS)
Airbag Seatbelts (Pilot & Copilot)
Engine and Fuel Monitoring
Electronic Approach Plates
406 MHz ELT
Weather Datalink & Audio Entertainment (XM)
Avionics Master Switch
Dual Toe Brakes
Dual Push-to-Talk Switches
Außenseite
Exterior
8 out of 10
Innenausstattung
Interior
8 out of 10

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

