Preis auf Anfrage
Standort des Flugzeugs:Cuernavaca, Morelos, Mexico
Verkäuferinformation
Verkäufer-Informationen anzeigenAllgemein
Jahr
1986
Hersteller
Modell
Zustand
Gebraucht
Based at
CUERNAVACA, MORELOS, MÉXICO
Beschreibung
1986 King Air C90 configured for 6 passengers, with 5,411.2 total airframe hours and 2,810 cycles. According to the specifications, both engines have 1,719.8 hours since overhaul and 0 hours since hot section inspection (HSI). Equipped with Garmin G600 TXi avionics, ADS-B In/Out, and four-blade McCauley Black Max propellers. A suitable option for executive and regional travel.
Flugzeuggestell
Total Time
5,411.2
Total Landings
2,810
Engine 1
Engine 1 Make/Model
PRATT & WHITNEY PT6A-21
Engine 1 Time
5,411.2 SNEW
Engine 1 TBO
3600
Engine 1 Cycles
2,810
Hot Section Time 1
0
Engine 1 Notes
LH Engine TSO: 1719.8 hrs
LH Engine TSHSI: 0.0 hrs
Engine 2
Engine 2 Make/Model
PRATT & WHITNEY PT6A-21
Engine 2 Time
5,411.2 SNEW
Engine 2 TBO
3600
Engine 2 Cycles
2,810
Hot Section Time 2
0
Ausstattung
Prop 1 Manufacturer
HARTZELL
Prop 1 Model
HC-B3TN-3M
Anzahl der Messer
4
Propeller mit gekehrter Klinge
Ja
Prop Specs
Overhauled in 2019
Luftfahrtelektronik
Hersteller der Primären Fluganzeige 2
GARMIN
Model der Primäre Fluganzeige 2
G600 TXI
GPS 1 Hersteller
GARMIN
GPS 1 Modell
GTN 750XI
GPS 2 Hersteller
GARMIN
GPS 2 Modell
GTN 750XI
ADS-B Equipped
Ja
Avionics/Radios
2 GARMIN G600 TXI; 2 750 TXI
Autopilot new generation
ADS-B In and Out
Innenausstattung
Year Interior
2015
Number of Seats
6
Interior
refurbishment in January 2015
Prüfstatus
Inspection Status
Phase I-IV: Completed September 2024
HSI recently applied
Phases 1 and 2 recently applied
Airworthy
Ja

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

