All(41)
£1,201,214
1/2 Fractional Ownership:
GBP £600,607
(Price entered as USD $800,000)
Aircraft Location:Palo Alto, California, USA
Seller Information
View Seller InformationGeneral
Year
2012
Manufacturer
Model
Serial Number
4697505
Condition
Used
Registration #
N138Y
FlightRules
IFR
Based at
KPAO
Description
2012 Piper Meridian N138Y, featuring a 500HP Pratt&Whitney PT6A-42A, four-blade Hartzell propeller and Garmin G1000 avionics with GFC700 autopilot, synthetic vision, TAWS-B, TCAS and Stormscope. Air conditioning and deice equipment complement this pressurized turboprop making it an all weather capable and comfortable platform. The aircraft and engine have a low 2,620.7 hours total time since new and 859.9 hours since hot-section inspection. November 2025 annual. Maintenance records available for review. Times subject to change as it is consistently flown.
Airframe
Total Time
2,620.7
Range
1,000 Nm
Complete Logs
Yes
Engine 1
Engine 1 Make/Model
PRATT & WHITNEY PT6A-42A
Engine 1 Time
2,630.7 SNEW
Engine 1 TBO
3500
Hot Section Time 1
859.9
Props
Prop 1 Manufacturer
HARTZELL
Prop 1 Model
HC-E4N-3Q
Prop 1 Time
2620.7 SNEW
Number of Blades
4
Avionics
Flight Deck Manufacturer/Model
GARMIN G1000
Transponder 1 Manufacturer
GARMIN
Transponder 1 Model
GTX33
Transponder 2 Manufacturer
GARMIN
Transponder 2 Model
GTX33
Autopilot Manufacturer
GARMIN
Autopilot Model
GFC700
ADS-B Equipped
Yes
FANS
Yes
WAAS
Yes
LPV
Yes
SVT
Yes
Additional Equipment
Pressurized
Yes
Flight Into Known Icing (FIKI)
Yes
Interior
Number of Seats
6
Configuration
Passenger
Interior
Also includes optional extra baggage stowage rack in place of one seat.
Inspection Status
Inspection Status
Annual Nov 2025
Airworthy
Yes

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

