£138,039
Localisation d'avion:Gainesville, Georgia, États-Unis
Information sur le vendeur
Voir les informations du vendeurGénéral
Année
2024
fabricant
Modèle
Registration #
N178SM
Numéro de série
1178
Etat
Occasion
Based at
KGVL
Total Time
402.6
Description
For Sale: Used 2024 Pipistrel Sinus Max – N178SM
Asking Price: $185,000 (or best offer)
Offered for sale is a 2024 Pipistrel Sinus Max, an efficient and versatile motor-glider with only 402.6 Airframe hours total time. This aircraft combines world-class soaring capability with modern avionics and cross-country performance.
✅ Airframe & Engine:
Year: 2024
Total Time: 402.6 hours
Engine Time: 327.4 hours
Come with Long wing tips and short wing tips
Will be delivered with a fresh annual inspection
✅ Avionics & Panel:
Garmin G3X Touch Glass Panel
Garmin Autopilot
Garmin GTX 335 Transponder
ADS-B In & Out
This Sinus Max represents an excellent opportunity to own a nearly new aircraft with a premium Garmin panel package, exceptional soaring performance, and efficient touring capabilities.
Location: Gainesville, GA (KGVL) – available for immediate sale.
Contact us today to schedule a viewing or request additional details.
Moteur
Engine 1 Time
327.4 SNEW
Engine(s)
Engine Manufacturer Rotax
Engine Model 912 UL (80 hp)
Max Take-off power 80 hp (60 kW)
Max Fuel Capacity 100 L or 60 L
Modifications/Conversions
Modifications/Conversions
comes with both the long and short wing tips
avionique
ADS-B Equipped
Oui
Avionics/Radios
Garmin G3X Touch Glass Panel
Garmin Autopilot
Garmin GTX 335 Transponder
ADS-B In & Out
LX S3 Audio Variometer
Garmin GDL 39R
Extérieur
Year Painted
2024
Intérieur
Year Interior
2024
Statut d'inspection
Inspection Status
Will come with a fresh annual inspection

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

