£171,670
Localisation d'avion:Columbus, Ohio, États-Unis
Information sur le vendeur
Voir les informations du vendeurLANE AVIATION
Contact:BRAD WILLETTE
Téléphone:(614) 681-7931
Columbus, Ohio, États-Unis
Général
Année
1982
fabricant
Modèle
Numéro de série
CE1004
Registration #
N7SP
Etat
Occasion
Based at
KCRW
Description
3697 Total, 111 Hours On an IO-550-B, 300 HP Engine and McCauley Prop. Tip Tanks, KFC-200 Autopilot, GPS, GMX-200 MFD, ADSB, WX-10A, Hangared, Complete Logs.
Cellule
Total Time
3,697
Complete Logs
Oui
Moteur
Engine 1 Make/Model
CONTINENTAL IO550B
Numéro de série du moteur
1036932
Puissance du moteur
223.71 kW
Engine 1 Time
111 SFRM
Engine TBO
1700
Engine(s)
Continental IO-550-B
300 HP STC
Serial #: 1036932
Installed in June 2022
Hélices
Prop Manufacturer
MCCAULEY
Temps d'hélice
111 SOH
Nombre de lames
3
Prop Specs
Prop Overhauled by H&S Props in June 2022
avionique
Avionics/Radios
CNX-80 GPS/Comm
Garmin SL-30 Comm
PS Eng PMA-8000G Audio Panel
Garmin 327 with ADSB Out
GMX-200 MFD
King KFC-200 Autopilot
King 55 HSI
WX-10A Stormscope
Intercom
Matériel supplémentaire
Additional Equipment
Tip Tanks
Rosen Visors
2d Horizon
Digital Tach
Insight G-2 GEM
D'Shannon Baffel Kit
Single Yoke
Electric Trim
Push to Talk Control Wheel
Large Luggage Door
4 Seats
Pilot Brakes
Hangared
Useful Load Approximately: 1239 LBS
Gross Weight: 3540 LBS
Extérieur
Exterior
Allover White with Navy Blue and Gold Trim
Original Paint from 1982.
Intérieur
Number of Seats
4
Interior
Slate Blue Leather Seats
Pilot and Copilot Sheepskin Covers
Recent Dark Blue Carpeting Installed
Statut d'inspection
Inspection Status
Annual Due: March 2027
IFR Cert Due: November 2026
Note: * Specifications Subject to Verification Upon Inspection *
.

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

