£96,254
Localisation d'avion:Columbus, Ohio, États-Unis
Information sur le vendeur
Voir les informations du vendeurLANE AVIATION
Contact:BRAD WILLETTE
Téléphone:+1 614-681-7931
Columbus, Ohio, États-Unis
Général
Année
1973
fabricant
Modèle
Numéro de série
28-7305342
Registration #
N55251
Etat
Occasion
Based at
KBKW
Description
2912 Total Time, 804 Since Overhaul, Garmin GNC-300XL GPS/Comm, KX-155, ADSB-Out, Century IIB Autopilot, Intercom, EGT, Hangared, All Logs.
Cellule
Total Time
2,912
Complete Logs
Oui
Moteur
Engine 1 Make/Model
LYCOMING O-360-A4A
Puissance du moteur
134.23 kW
Engine 1 Time
804 SMOH
Engine TBO
2000
Hélices
Prop Manufacturer
SENSENICH
Temps d'hélice
898 SOH
Prop Specs
Prop Overhaul in June 1998
avionique
Avionics/Radios
Garmin GNC-300XL GPS/ Comm
King KX-155 Digital Nav/Comm
King KMA-24 Audio Panel
Narco AT-150 Transponder
Sky Beacon ADSB - Out. on Tail
Century IIB Autopilot with Heading Bug
David Clark Intercom - 4 Place
Matériel supplémentaire
Additional Equipment
Electric Trim
David Clark 4 Place Built-In Intercom
Dual Push-to-Talk Buttons on Control Wheels
Wing Tip & Tail Strobes
EGT -
Vertical Card Compass
Carb Temp Guage
Wheel Pants - Mains in a Box. Go with Sale
Flap Gap Seals
12 Volt Ground Service Plug
True Airspeed Indicator
Pilot Brakes
Useful Load Approximately: 933 LBS.
Complete Logs
Hangared
Extérieur
Exterior
Allover White with Forest Green and Black Trim
Hangared
Intérieur
Interior
Green Fabric Seats (4)
Gray Carpeting
Statut d'inspection
Inspection Status
Annual Due: December 2026
Hangared
Complete Logs
Small Repair to Lower Door Skin. Fixed Many Years Ago.
* Specifications Subject to Verification Upon Inspection *
.

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

