£289,747
£289,747 + GST = GBP £333,209 (TVA applies to buyers in Nouvelle-Zélande)
Localisation d'avion:Auckland, North Island, Nouvelle-Zélande
Information sur le vendeur
Voir les informations du vendeurPacific AirHub Aircraft Sales Ltd
Contact:Stephen Green
Téléphone:+64 21 280 3951
Auckland, Nouvelle-Zélande
Général
Année
2006
fabricant
Modèle
Etat
Occasion
Description
Exclusive to Pacific AirHub - Low time, 2006 Enstrom 480B Turbine available ex Ardmore Base, New Zealand.
Good times remaining on major components - MGB/TGB.
Dual controls, covers & ground handling wheels included with sale. Shipping gear available.
Contact Pacific AirHub for more information.
+GST if sold within New Zealand.
Cellule
Temps total
1,522
Notes sur la cellule
PAX CONFIG
WELL MAINTAINED
Rotor
Temps restant sur la boîte de vitesse du rotor principal
1128
Temps restant sur la boîte de vitesse du rotor arrière
500
Engine 1
Engine 1 Make/Model
ROLLS ROYCE
Notes moteur 1
ROLLS ROYCE 250-C20W
ENGINE TOTAL TIME: 1,522
HOURS REMAINING:
1ST STAGE WHEEL: 252
2ND STAGE WHEEL: 252
3RD STAGE WHEEL: 3,027
4TH STAGE WHEEL: 3,027
COMPRESSOR: 1,977
IMPELLOR: 2,027
avionique
Équipé de l'ADS-B
Oui
ELT
Oui
Avionique / radio
GNS 530 NAV/COM/GPS
ASPIN PFD & MFD
GMA340 AUDIO PANEL
L3 ADSB IN AND OUT
KANNAD 406 ELT
Matériel supplémentaire
Commandes doubles
Oui
Équipement additionnel
DUAL CONTROLS
COVERS
3 & 5 SEAT CONFIGURATION
GROUND HANDLING WHEELS
SHIPPING GEAR AVAILABLE
Extérieur
Notes extérieures
GOOD PAINT QUALITY
Intérieur
Notes intérieures
3 AND 5 SEAT CONFIGURATION
Statut d'inspection
Statut de l'inspection
TIME REMAINING:
MAIN ROTOR GEARBOX: 1,128
TAIL ROTOR GEARBOX: 500
MAIN ROTOR BLADES: O/C
TAIL ROTOR BLADES: O/C
Navigable
Oui

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

