£249,089
Localisation d'avion:Orlando, Florida, États-Unis
Information sur le vendeur
Voir les informations du vendeurGénéral
Année
1984
fabricant
Modèle
Numéro de série
31-8452019
Registration #
N599AH
Etat
Occasion
FlightRules
IFR
Description
Colemill Panther Conversion, GNS530, XM, GTX330, ADSB in & out, KFC200 AP, VG's, Shadin, K-ice, Cargo door, Clean!
FRESH ANNUAL - MAY 2026
Cellule
Total Time
7,793.8
Complete Logs
Oui
Winglets
Oui
Engine 1
Engine 1 Time
1,526.9 SFOH
Engine 1 TBO
1800
Moteur 1 Turbo
Oui
Engine 2
Engine 2 Time
691.6 SFRM
Engine 2 TBO
1800
Moteur 2 Turbo
Oui
Hélices
Temps d'hélice 1
507.1 SMOH
Temps d'hélice 2
507.1 SMOH
Nombre de lames
4
Modifications/Conversions
Générateurs de vortex
Oui
avionique
ADS-B Equipped
Oui
WAAS
Oui
Avionics/Radios
Garmin GNS530 WAAS IFR GPS/Color Moving Map/NAV/COM King KX165 NAV/COM Garmin 696 panel mount with XM weather Garmin GMA340 Audio Panel Garmin GTX330ES Transponder with ADS-B in and out King KR87 ADF King KN64 DME King KFC200 Autopilot/Flight Director/Slaved HSI
Matériel supplémentaire
Oxygen System
Oui
Climatisation
Oui
Additional Equipment
Colemill Panther conversion with Zip Tip Winglets with Landing Lights, 4 Blade Q-tip Propellers, Vortex generators, Shadin Fuel Computer, Dual mags, Known ice, Air conditioning, Cargo door, Oxygen, Polished spinners, Cleveland wheels and brakes.
Extérieur
Year Painted
2022
Exterior Notes
The paint is Matterhorn White with Dark Blue and Cobalt Blue stripes.
Intérieur
Interior Notes
The interior is Taupe leather in 8 place executive configuration with bar, tables, dividers and potty.
Statut d'inspection
Inspection Status
FRESH ANNUAL COMPLETED MAY 2026
Airworthy
Oui

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

