£108,699
Localisation d'avion:Redondo Beach, California, États-Unis
Information sur le vendeur
Voir les informations du vendeurPlatinum Fighter Sales
Contact:Sales Team
Téléphone:(951) 366-7006
Redondo Beach, California, États-Unis
Général
Année
1941
fabricant
Modèle
Numéro de série
240
Registration #
N66143
Etat
Occasion
FlightRules
VFR
Description
Beautiful Fairchild 24. Oshkosh winner with a unique military history. Built in 1941 for the Army Air Corps with a 165 hp Warner Scarab engine, N66143 was originally designated for delivery to the Royal Air Force under lend-lease as an Argus I (serial number EV730). Pearl Harbor caused the Air Corps to cancel its delivery to England and, as a UC-61 (serial number 41-38794), it spent World War II as a utility aircraft operating in the Caribbean and South America. Sold as surplus after the war, the aircraft went through several civilian owners until becoming derelict in 1968 after accumulating just 1,342 flight hours. Rescued in 1983, the aircraft was the subject of a 26 year restoration during which time a 200 hp Ranger replaced the Warner Scarab, thereby converting the 24W into a 24R. At Oshkosh 2023, N66143 was awarded the Bronze Lindy as the World War II Era Champion in the Antique category.
Cellule
Total Time
1,755
Complete Logs
Yes
Moteur
Engine 1 Make/Model
RANGER 6-440C-5
Puissance du moteur
149.14 kW
Engine 1 Time
261 SMOH
Engine TBO
1400
Aftermarket Engine STC
No
Hélices
Prop Manufacturer
SENSENICH
Prop Model
W86R-58
Nombre de lames
2
avionique
Flight Deck Manufacturer/Model
TRIG
WAAS
Yes
Extérieur
Year Painted
2009
Intérieur
Year Interior
2009
Statut d'inspection
Inspection Status
Annual completed 3/26
Airworthy
Yes

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

