£119,114
Localisation d'avion:Prince Albert, Saskatchewan, Canada
Information sur le vendeur
Voir les informations du vendeurAircraft Canada
Contact:Dallas Nigh
Téléphone:+1 587-583-5013
Calgary, Alberta, Canada
Général
Année
1974
fabricant
Modèle
Numéro de série
D9646
Registration #
C-GOUF
Etat
Occasion
FlightRules
VFR
Description
1974 Beechcraft Bonanza V35B – C-GOUF
Serial No: D-9646
A clean, low-time example of the iconic V-tail Bonanza, C-GOUF offers excellent performance, efficiency, and timeless Beechcraft quality. With just 1,548.2 hours total time since new, this aircraft presents a rare opportunity to step into a well-kept airframe with strong fundamentals.
Powered by a Continental IO-520-B and paired with a Hartzell 3-blade propeller (2016), this V35B delivers the speed and reliability the Bonanza line is known for.
Avionics include:
JPI 700 Engine Monitor
Bendix King Transponder
King KMD 150 Multi-Function Display
King KMA 24H Audio Panel (TSO)
King MX 170C NAV/COM
Whether you’re upgrading or stepping into a high-performance single, this Bonanza offers a solid platform with classic styling and proven capability.
Cellule
Total Time
1,548.2
Max Takeoff Weight
1,542.21 kg
Complete Logs
Oui
Moteur
Engine 1 Make/Model
CONTINENTAL IO520B
Puissance du moteur
212.52 kW
Engine 1 Time
1,548.2 SMOH
Engine TBO
1700
Hélices
Prop Manufacturer
HARTZELL
Prop Model
PHC-C3YF-1RF
Nombre de lames
3
Prop Specs
Overhauled December 2016
avionique
Avionics/Radios
JPI 700 Engine Monitor
Bendix King Transponder
King KMD 150 Multi-Function Display
King KMA 24H Audio Panel (TSO)
King MX 170C NAV/COM
Extérieur
Exterior
8/10
Intérieur
Number of Seats
4
Configuration
Passenger
Interior
7/10
Statut d'inspection
Inspection Status
July 2025
Airworthy
Oui

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

