Appelez pour le prix
Localisation d'avion:Brisbane, Queensland, Australie
Information sur le vendeur
Voir les informations du vendeurGénéral
Année
2024
fabricant
Modèle
Numéro de série
50500774
Registration #
VH-NJR
Etat
Occasion
FlightRules
IFR
Based at
YBBN
Description
Single owner since new, delivered new 6 March 2024
Available immediately
Professionally operated since new by only two high time ATPL crew
Maintained since new by ExecuJet MRO Services, an Embraer Authorized Service Centre
First major (800 hour) inspection about to complete, clearing all outstanding maintenance, so the aircraft transfers fully up to date
Programme free, not on any engine, airframe, avionics or APU programme, leaving the next owner free to elect their preferred arrangements
Balance of Embraer (5 years / 5,000 hours) and Pratt & Whitney Canada engine (3 years / 2,500 hours) new aircraft warranties remaining
No major damage history
Tracked on CAMP Systems, complete and continuous records since new
Inmarsat Swift Broadband high speed connectivity, in flight phone and datalink
Custom matt black exterior over Embraer's bespoke Bossa Nova interior (Ultraleather, Aeristo leathers, carbon fibre, Corian, piano black, silk blend carpet)
Delivery available worldwide by arrangement, with an export certificate of airworthiness
Offered by expressions of interest, price on application
Cellule
Total Time
800
Total Landings
600
Range
2,010 Nm
Maintenance Tracking
Camp
Parts Maintenance Program
Aucun
Engine Program
Engine 1 Maintenance Program
Aucun
Extérieur
Year Painted
2024
Exterior
Factory Delivered Custom matt black
Intérieur
Year Interior
2024
Number of Seats
9
Statut d'inspection
Inspection Status
Currently undergoing 800 Hour Inspection
Airworthy
Oui

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

