Tous(15)
£73,611
Localisation d'avion:Santa Ana, California, États-Unis
Information sur le vendeur
Voir les informations du vendeurOC Aircraft Sales
Contact:Gary Sequeira
Téléphone:+1 949-922-5263
Newport Beach, California, États-Unis
Général
Année
1975
fabricant
Modèle
Numéro de série
177RG-0673
Registration #
N2726V
Etat
Occasion
FlightRules
IFR
Based at
KSNA (John Wayne)
Cellule
Total Time
4,064
Max Takeoff Weight
1,270.06 kg
Fuel Capacity Volume
227.12 L
Complete Logs
Oui
Airframe
Major price reduction. Seller says it’s time to move on. Original Logs Since New. No major Damage History Noted.
Moteur
Engine 1 Make/Model
LYCOMING IO-360-A1B6D
Engine 1 Time
1,556 SFOH
Engine TBO
2000
Engine(s)
Engine removed and reinstalled in 2010 for metal contamination, with 910 SFOH. 646 Hours ago.
Hélices
Prop Manufacturer
MCCAULEY
Prop Model
B2D34C207
Temps d'hélice
178 SMOH
Nombre de lames
2
Composition de lame
Aluminium
Prop Specs
Fresh Overhaul 2018
avionique
ADS-B Equipped
Oui
dispositif de contrôle de moteur
Oui
Avionics/Radios
Narco Mark 12D Nav/Com
ARC 300 Nav/Com System
Dual Glideslope
Garmin GNX 375 GPS Transponder System
King KN 61 DME (Inop)
Digital EGT System
Digital Fuel Flow System
Digital Avtron M800 Chronometer
4 Place intercom system
3LMB
Matériel supplémentaire
Additional Equipment
Rosen Visors
Wing Tip Strobes
Precise Flight Standby Vacuum system
Door Steward Mod
LED Taxi and Landing Light Mods
Upgraded Monarch Fuel Caps
Extérieur
Year Painted
1992
Exterior
Overall White/2 Tone Orange trim. Overall good, with some Chipping.
Intérieur
Number of Seats
4
Configuration
Passenger
Interior
Tan Vinyl. Very good Condition.
Statut d'inspection
Inspection Status
Fresh Annual June, 2026.
Airworthy
Oui
service d'identifiant

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

