£87,950
Localisation d'avion:Columbus, Ohio, États-Unis
Information sur le vendeur
Voir les informations du vendeurLANE AVIATION
Contact:BRAD WILLETTE
Téléphone:(614) 681-7931
Columbus, Ohio, États-Unis
Général
Année
1966
fabricant
Modèle
Numéro de série
18256889
Registration #
N2789F
Etat
Occasion
Based at
ID: I23 - Washington Court House, Ohio
Description
3717 Total Time, 1227 Since Overhaul, King Nav/Comms, Apollo VFR GPS, 4 Place Intercom, 78 Gallon Long Range Fuel, Complete Logs, Hangared,
Cellule
Total Time
3,717
Complete Logs
Oui
Moteur
Engine 1 Make/Model
CONTINENTAL O470R
Engine 1 Time
1,227 SMOH
Engine TBO
1500
Engine(s)
Engine Overhaul by Clydesdale Engines in July 1978.
Good Compression. Hangared.
Hélices
Prop Manufacturer
MCCAULEY
Temps d'hélice
457 SOH
Nombre de lames
2
Composition de lame
Aluminium
Prop Specs
Prop Overhaul in August 2007
avionique
Avionics/Radios
King KX-155 Digital Nav/Comm
Glideslope on #1
King KX-175B Nav/Comm
Apollo VFR GPS
KMA-24 Audio Panel
Garmin 327 No ADSB Transponder
King KR-86 ADF
Sigtronics 4 Place Intercom
.
Matériel supplémentaire
Additional Equipment
78 Gallon Long Range Fuel
Digital Timer & Clock
Avionics Master
Alcor EGT -- Single Probe
Carb Temp Guage
True Airspeed Indicator
New Style Horizon
Rear Seat Vents
Pilot Articulating Vertical Adjusting Seat
Built-In 4 Place Sigtronics Intercom
Useful Load: Just over 1000 LBS.
Complete Logs
Hangared
.
Extérieur
Exterior
Allover White with Olive Green and Black Trim
Intérieur
Interior
Gray Fabric Seats and Carpeting
Statut d'inspection
Inspection Status
Annual Due: October 2026
Hangared
Complete Logs
** Specifications Subject to Verification Upon Inspection **
.

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

