Chiama per sapere i costi
Posizione dell' Aereomobile:Westerham, England, Gran-Bretagna
Informazioni sul venditore
Visualizza le informazioni sul venditoreGenerale
Anno
1992
Produttore
Modello
Numero di serie
063
Condizione
Usati
Registrazione #
N160RM
Normative di volo
IFR
Fondata
LFHV
Descrizione
TBM 700 A model with a recent engine (only 1,500 hours since OVH - TBO at 3,500 hours)
No damage history.
Step up to the turbine world at an attractive price and enjoy the high levels on the super light edition of the TBM!
Very well maintained TBM 700A by Daher HQ factory service station.
Recent windshields, deice boots, radar, starter generator, flap motor.
Airframe life extension SB applied.
Daher maintained from 1992 to 2000 with letter to certify no damage history from their service center director. All logbooks from 2000 until 2026.
Great speed and short field performance
Struttura velivolo
Tempo totale
5,100
Peso massimo al decollo
2,984 kg
Complete Logs
Si
Engine Program
Engine 1 Maintenance Program
Altro
Engine 1
Engine 1 Make/Model
PRATT & WHITNEY PT6A-64
Engine 1 Time
1,500 SMOH
Motore 1 TBO
3500
Avionica
Flight Deck Manufacturer/Model
GARMIN G600 TXI
Avionica/Radio
GARMIN PFD G600TXI
GARMIN GFC600 AUTOPILOT
GARMIN STANDBY INSTRUMENT
GTN750Xi
GTN 650
WX 500 Stormscope with indicator and output
to the MFD
KNI 582 RMI Indicator connected to heading nº2
DME KN 63 with output to the EHSI
GARMIN GTS 800 Traffic to G600TXI et GTN 750Xi
GARMIN 330ES transponder
Yaw damper with Symbol Generator
Honeywell Altimeter
Stand-by vacuum Artificial horizon
406 MHz ELT
Shadin ETM Engine Trend Monitor.
Honeywell Enhanced Ground Proximity
Warning
System (EGPWS)
Attrezzatura Aggiuntiva
Pressurizzato
Si
Volo in presenza di ghiaccio
Si
Libretti manutenzione

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

