Chiama per sapere i costi
Posizione dell' Aereomobile:Raleigh, North Carolina, Stati Uniti
Informazioni sul venditore
Visualizza le informazioni sul venditoreGenerale
Anno
2008
Produttore
Modello
Numero di serie
0265
Condizione
Usati
Descrizione
Fully Enrolled on Programs
Fresh MPI and 16C (192 months Inspection)
Electronic Charts
Datalink
8 Passenger Configuration
Struttura velivolo
Tempo totale
3,428
Sbarchi totali
2,410
Monitoraggio di mantenimento
Camp
Fusoliera
Program Coverage JSSI
Engine Program
Engine 1 Maintenance Program
MSP
Engine 1
Motore 1 - Numero di serie
P-126225
Engine 1 Time
3,428 SNEW
Engine 1 Cycles Since Overhaul
2,410
Motore 1 Note
Honeywell TFE731-40AR-200G
Engine 2
Motore 2 - Numero di serie
P-126224
Engine 2 Time
3,428 SNEW
Engine 2 Cycles Since Overhaul
2,410
Motore 2 Note
Honeywell TFE731-40AR-200G
Auxiliary Power Unit
APU
Si
Note APU
Description Honeywell RE-100CS
Serial Number P-411
APU Total Time Since New 1,710 Hours
Program Coverage MSP
Avionica
Avionica/Radio
The Gulfstream G150 is equipped with an integrated Collins Proline 21 avionics suite.
Attrezzatura Aggiuntiva
Attrezzature aggiuntive
ADS-B Out
Jeppesen Electronic Charts
Arinc Direct Datalink
Collins DBU-4100
Esteriore
Esteriore
Base Paint Color White
Stripes Orange, Grey and Black
Last Refurbished 2014
Interno
Interiore
Number of Passengers Eight (8)
Galley Location Forward
Forward Cabin Configuration Two Place Divan (2) Opposite One (1) Fwd Facing Seat
Aft Cabin Configuration Four (4) Place Double Club
Lavatory Location One (1) Aft Belted Lavatory
Last Refurbished Original
Stato Ispezione
Stato di ispezione
Inspection Last Performed Next Due
24 Month Nov 2023 Nov 2025
48 Month March 2021 Nov 2025
96 Month Sept 2024 Sept 2032
192 Month Dec 2024 Dec 2036

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

