£97,746
Posizione dell' Aereomobile:Columbus, Ohio, Stati Uniti
Informazioni sul venditore
Visualizza le informazioni sul venditoreLANE AVIATION
Contatto:BRAD WILLETTE
Telefono:(614) 681-7931
Columbus, Ohio, Stati Uniti
Generale
Anno
1973
Produttore
Modello
Numero di serie
28-7305342
Registrazione #
N55251
Condizione
Usati
Fondata
KBKW
Descrizione
2912 Total Time, 804 Since Overhaul, Garmin GNC-300XL GPS/Comm, KX-155, ADSB-Out, Century IIB Autopilot, Intercom, EGT, Hangared, All Logs.
Struttura velivolo
Tempo totale
2,912
Complete Logs
Si
Motore
Engine 1 Make/Model
LYCOMING O-360-A4A
Cavalli
134.23 kW
Engine 1 Time
804 SMOH
Engine TBO
2000
Stima
Prop Manufacturer
SENSENICH
Prop Tempo di revisione
898 SOH
Prop Specs
Prop Overhaul in June 1998
Avionica
Avionica/Radio
Garmin GNC-300XL GPS/ Comm
King KX-155 Digital Nav/Comm
King KMA-24 Audio Panel
Narco AT-150 Transponder
Sky Beacon ADSB - Out. on Tail
Century IIB Autopilot with Heading Bug
David Clark Intercom - 4 Place
Attrezzatura Aggiuntiva
Attrezzature aggiuntive
Electric Trim
David Clark 4 Place Built-In Intercom
Dual Push-to-Talk Buttons on Control Wheels
Wing Tip & Tail Strobes
EGT -
Vertical Card Compass
Carb Temp Guage
Wheel Pants - Mains in a Box. Go with Sale
Flap Gap Seals
12 Volt Ground Service Plug
True Airspeed Indicator
Pilot Brakes
Useful Load Approximately: 933 LBS.
Complete Logs
Hangared
Esteriore
Esteriore
Allover White with Forest Green and Black Trim
Hangared
Interno
Interiore
Green Fabric Seats (4)
Gray Carpeting
Stato Ispezione
Stato di ispezione
Annual Due: December 2026
Hangared
Complete Logs
Small Repair to Lower Door Skin. Fixed Many Years Ago.
* Specifications Subject to Verification Upon Inspection *
.

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

