£166,238
Posizione dell' Aereomobile:Placerville, California, Stati Uniti
Informazioni sul venditore
Visualizza le informazioni sul venditoreGenerale
Anno
1953
Produttore
Modello
Numero di serie
18-2340
Registrazione #
N226T
Condizione
Usati
Descrizione
Complete logs, A restored and upgraded L21 military Supercub. Only about 300 were built. many upgrades and performance modifications and STCS added.
Struttura velivolo
Tempo totale
5,287
Complete Logs
Si
Fusoliera
Airframe overhauled in 2018 By Steve's Aircraft
Top deck X brace
68 gallons fuel capacity. (wings and belly)
31" bushwheels
Baby Buswheel tailwheel
Alaska Bushwheels tailwheel spring
Atlee Dodge underseat battery
Extended baggage
Landis fuel pod
Extended wings
Extended ailerons
Steve's Aircraft brake boosters
Steve's Aircraft gascolator
Sutton exhaust
Rear oil cooler
Borer 82/43 propeller
External baggage door
Rear cargo space
ELT
Motore
Engine 1 Time
343 SMOH
Engine TBO
2000
Motore/i
Airframe overhauled in 2018 By Steve's Aircraft
Top deck X brace
68 gallons fuel capacity. (wings and belly)
31" bushwheels
Baby Buswheel tailwheel
Alaska Bushwheels tailwheel spring
Atlee Dodge underseat battery
Extended baggage
Landis fuel pod
Extended wings
Extended ailerons
Steve's Aircraft brake boosters
Steve's Aircraft gascolator
Sutton exhaust
Rear oil cooler
Borer 82/43 propeller
External baggage door
Rear cargo space
ELT
Avionica
Avionica/Radio
Lightweight VFR gyro panel
Flightline FL-760A Com
Esteriore
Esteriore
Overall white with red accents in traditional Cub scheme.
Interno
Anno Interno
2018
Interiore
New interior with 2018 restoration.
Stato Ispezione
Stato di ispezione
Annual Due: May 2026
Idoneo alla navigazione aerea
Si

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

