1978 BEECHCRAFT A36 BONANZA
£196,955
Posizione dell' Aereomobile:Oakland, California, Stati Uniti
Informazioni sul venditore
Visualizza le informazioni sul venditoreFive by Five Aviation, LLC
Contatto:John Love
Telefono:(774) 230-3191
Sutton, Massachusetts, Stati Uniti
Generale
Anno
1978
Produttore
Modello
Condizione
Usati
Registrazione #
N23682
Descrizione
A very handsome, well equipped A36. 713 hours on a RAM engine and only 421 on prop since overhaul. Recent avionics upgrade with all Garmin equipment including a GTN750, GNC255, and the best available autopilot, a 3 axis Garmin GFC500. Owned by an experienced aviator who has pampered and upgraded this A36 to make it a very advanced cross country airplane. Annual due November of 2025 but owner willing to negotiate to include a fresh annual with sale.; Current IFR cert.
Struttura velivolo
Tempo totale
5,550
Motore
Engine 1 Make/Model
CONTINENTAL IO520
Engine 1 Time
713 SMOH
Engine TBO
1800
Motore/i
Overhauled by RAM
Stima
Prop Tempo di revisione
421 SOH
Avionica
Avionica/Radio
COMMS: Garmin GTN750, Garmin GNC255
NAVS: Garmin GTN750, Garmin GNC255
AUDIO PANEL: PS engineering 8000G
TRANSPONDER: Garmin 345
ENCODER: ADSB in/out
PFD: dual Garmin G5's
INTERCOM: 6 place
AUTO PILOT: Garmin GFC500 3 axis autopilot
Attrezzatura Aggiuntiva
Attrezzature aggiuntive
SRS Aviation STC 1 piece instrument panel, New Commant nav/GS antennas, Airtex 345 ELT, Great Lakes Aero Products side windows, new Cygnet Aerospace Dual 'V-up' control yoke with trim.
Esteriore
Esteriore
White with red, blue and gold trim.
Grade 6.
Interno
Interiore
Brown vinyl/fabric.
Grade 8.
Stato Ispezione
Stato di ispezione
Annual inspection 11/2024.

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

