£275,175
Posizione dell' Aereomobile:Mcminnville, Oregon, Stati Uniti
Informazioni sul venditore
Visualizza le informazioni sul venditoreGenerale
Anno
2014
Produttore
Modello
Condizione
Usati
Descrizione
Purpose built training helicopter designed by an AS350 Engineer. I trained in this helicopter when it was new at Precision the North American Dealer. I also instructed at the flight school with it as well as with the private owner that purchased it from Precision. It is well equipped for IFR training and can easily be outfitted with a cargo hook for cheap long line training. The Private owner only fly's his A-Star now so this well maintained G2 is ready for the next assignment. Will be sold with updated maintenance and a fresh annual. Lots of time left on components. Like new heli wagon remote controlled landing platform is also for sale. Located in McMinnville, Oregon.
Can be delivered and/or sold with flight instruction. Will be sold with updated maintenance and a fresh annual performed by the North American Guimbal dealer.
-Engine Since Major Overhaul 650hrs
-Main Gearbox and Tail gearbox have 1430 hrs remaining to Overhaul
-WAAS Garmin GTN 650 GPS/Com(can link adsb data to overlay traffic on Foreflight)
-Garmin GTX 345 Transponder(ADSB In/Out)
-Garmin GNC 215 Com 2
-VOR Reciever(VLOC or GPS with Localizer and Glideslope)
-RC Allen Digital Attitude Indicator
-RC Allen Digital Directional Gyro
-Ram ball mounts left and right side of Instrument panel for Ipad mounting
-Lemo and U174 Helicopter headset plugs
-Fresh annual with new parts and repairs in progress by the North American Guimbal dealer
Struttura velivolo
Tempo totale
4,563
Motore
Engine 1 Time
650 SMOH
Tempo di utilizzo del motore tra le revisioni
2200

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

