2004 BEECHCRAFT A36 BONANZA
Chiama per sapere i costi
Posizione dell' Aereomobile:Woodland, California, Stati Uniti
Informazioni sul venditore
Visualizza le informazioni sul venditoreGenerale
Anno
2004
Produttore
Modello
Numero di serie
E-3537
Registrazione #
N923RL
Condizione
Usati
Descrizione
Only 2845 hours on this very well maintained A36 Bonanza. Equipped with Tornado Alley turbo, air-conditioning, Garmin 530W/430W (WAAS) Garmin GTX-345 (ADS-B in-and-out traffic), 40-gallon Osborne tip tanks and more!
ALL SPECS SUBJECT TO VERIFICATON BY PURCHASER
Struttura velivolo
Tempo totale
2,855
Fusoliera
Total Time 2855
Max Takeoff Weight: 4,000 lb
Basic Empty Weight: 2,809.02 lb
Useful Load: 1,090.98 lb
Fuel Capacity Volume: 114 gal
Complete Logs: Yes
Motore
Engine 1 Time
1,510 SNEW
Engine TBO
2200
Motore/i
Continental / 300 HP
Stima
Prop Specs
Prop Manufacturer: MT
Prop Model: Scimitar Composite
Number of Blades: 3
Avionica
Avionica/Radio
Dual Garmin GNS-530Ws
Bendix/King KFC-225 Autopilot/Flight Control System w/Yaw Damper
Bendix/King KCS-55A Slaved HSI w/Flight Director
Bendix/King KMD-550 MFD
Garmin GTX-345 w/ADS-B in-and-out traffic
JPI EDM-800 Engine Monitoring System
Standby Electric Horizon
ALL SPECS SUBJECT TO VERIFICATION BY PURCHASER
Attrezzatura Aggiuntiva
Attrezzature aggiuntive
Factory Installed Air Conditioning
Mountain High 6-Place built-in Oxygen System
Precise Flight Speed Brake System
Tinted Windows
Rosen Sun Visors
MT Composite Prop
Esteriore
Esteriore
2004
#1 – Shell, #2 – Astro Blue, #3 – Clarett, #4 - Black
Interno
Anno Interno
2004
Numero di posti a sedere
6
Configurazione
Passenger
Stato Ispezione
Stato di ispezione
Annual inspection completed by Ugalde Aviation of Fallon, NV September 2025.

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

