£110,097
Posizione dell' Aereomobile:Redondo Beach, California, Stati Uniti
Informazioni sul venditore
Visualizza le informazioni sul venditorePlatinum Fighter Sales
Contatto:Sales Team
Telefono:+1 951-366-7006
Redondo Beach, California, Stati Uniti
Generale
Anno
1941
Produttore
Modello
Numero di serie
240
Registrazione #
N66143
Condizione
Usati
Normative di volo
VFR
Descrizione
Beautiful Fairchild 24. Oshkosh winner with a unique military history. Built in 1941 for the Army Air Corps with a 165 hp Warner Scarab engine, N66143 was originally designated for delivery to the Royal Air Force under lend-lease as an Argus I (serial number EV730). Pearl Harbor caused the Air Corps to cancel its delivery to England and, as a UC-61 (serial number 41-38794), it spent World War II as a utility aircraft operating in the Caribbean and South America. Sold as surplus after the war, the aircraft went through several civilian owners until becoming derelict in 1968 after accumulating just 1,342 flight hours. Rescued in 1983, the aircraft was the subject of a 26 year restoration during which time a 200 hp Ranger replaced the Warner Scarab, thereby converting the 24W into a 24R. At Oshkosh 2023, N66143 was awarded the Bronze Lindy as the World War II Era Champion in the Antique category.
Struttura velivolo
Tempo totale
1,755
Complete Logs
Si
Motore
Engine 1 Make/Model
RANGER 6-440C-5
Cavalli
149.14 kW
Engine 1 Time
261 SMOH
Engine TBO
1400
Stima
Prop Manufacturer
SENSENICH
Prop Model
W86R-58
Numero di lame
2
Avionica
Flight Deck Manufacturer/Model
TRIG
WAAS
Si
Esteriore
Anno dipinto
2009
Interno
Anno Interno
2009
Stato Ispezione
Stato di ispezione
Annual completed 3/26
Idoneo alla navigazione aerea
Si

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

