1975 CESSNA U206F STATIONAIR
£192,696
£192,696 + GST = GBP £221,601 (GST applies to buyers in Nuova Zelandia)
Posizione dell' Aereomobile:Mount Maunganui, Bop, Nuova Zelandia
Informazioni sul venditore
Visualizza le informazioni sul venditoreGenerale
Anno
1975
Produttore
Modello
Condizione
Usati
Registrazione #
ZK-DWM
Descrizione
1975 U206F ZK-DWM
A very tidy Cessna 206. We have owned this aircraft for approximately 2 years and it has served our company well. We have to make room in the hangar for the new arrival so sadly we have to say goodbye to DWM.
Will easily achieve 125 KIAS in the cruise and has an impressive payload capacity of 719kg. You can comfortably get 6 on board with a couple hours of fuel.
This aircraft would suit a private owner or a Part 135 operator as the engine is not on condition and has many years of worry free flying ahead!
Aircraft Details:
Total Airframe Hours Since New: 6540.2
Total Engine Hours Since New: 269.6
Date of engine manufacture: July 2023
Date engine first entered service: 21/9/2023
Total Propeller Hours Since New: 322.0
Date of last Propeller Overhaul: 19/11/2004
Engine: IO 520-F42B
Nav/Comm: Garmin 345 Audio panel, Garmin GTR200 Radio x2, Garmin AERA 660 VFR GPS
If you would like any more information about the aircraft or would like to arrange an inspection feel free to get in touch.
The aircraft is still being used, so expect the times listed above to change. Aircraft is located in Mount Maunganui, New Zealand.
Struttura velivolo
Tempo totale
6,540.2
Motore
Engine 1 Make/Model
LYCOMING
Engine 1 Time
269.6 SNEW
Engine TBO
2000
Stima
Prop Tempo di revisione
322 SNEW
Stato Ispezione
Idoneo alla navigazione aerea
Si

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

