£170,959
Posizione dell' Aereomobile:Columbus, Ohio, Stati Uniti
Informazioni sul venditore
Visualizza le informazioni sul venditoreLANE AVIATION
Contatto:BRAD WILLETTE
Telefono:(614) 681-7931
Columbus, Ohio, Stati Uniti
Generale
Anno
1999
Produttore
Modello
Numero di serie
34-49109
Registrazione #
N609MA
Condizione
Usati
Descrizione
3196 Total Time, 1701/1701 SMOH, Full De-Ice, Air, 123 Gallons, Garmin 530W, RDR-2000 Color Radar, WX-1000, Aspen PFD, KFC-150 with Preselect, Hangared, All Logs
Struttura velivolo
Tempo totale
3,196
Complete Logs
Si
Engine 1
Engine 1 Make/Model
CONTINENTAL TSIO360RB
Engine 1 Time
1,701 SMOH
Motore 1 TBO
1800
Engine 2
Engine 2 Make/Model
CONTINENTAL TSIO360RB
Engine 2 Time
1,701
Stima
Prop 1 Fabbricante
HARTZELL
Prop 1 Tempo di revisione
1701 SOH
Prop 2 Produttore
HARTZELL
Prop 2 Tempo di revisione
1701 SOH
Numero di lame
3
Avionica
Avionica/Radio
Garmin 530WAAS
King KX-155A Nav/Comm
PS Eng PMA-7000B Audio Panel
ADSB Transponder
King KFC-150 Autopilot
Aspen Evolution PFD
Altitude Alert and Preselect
Bendix RDR-2000 Color Radar
WX-1000 Stormscope
Attrezzatura Aggiuntiva
Attrezzature aggiuntive
Full De-Ice Package
Factory Airconditioning'
123 Gallons Fuel
Copilot Horizon
Copilot HSI
3d Horizon - Pilot Side
Digital Fuel Quantity Indicator
True Airspeed Indicator
Complete Logs Since New
Gear-up in 2008. Overhauled Engines and Props
Hangared
Esteriore
Esteriore
Allover White with Dark Red and Navy Blue Trim -
Interno
Interiore
Tan Leather Seating
Beige Carpeting
Stato Ispezione
Stato di ispezione
Annual Due: August 2027
Complete Logs
Hangared
Gear Up in November 2008, All repairs made and Overhaul to Engines and Props
** Specifications Subject to Verification Upon Inspection **
.

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

