£209,488
£209,488 + GST = GBP £230,437 (GST applies to buyers in Australia)
Aircraft Location:Perth, Western Australia, Australia
Seller Information
View Seller InformationGeneral
Year
1978
Manufacturer
Model
Serial Number
E-1383
Registration #
VH-BQA
Condition
Used
FlightRules
IFR
Based at
Perth. Western Australia
Description
1978 Bonanza A36 with turbo-normalised IO-520 engine, Garmin G3X avionics, Garmin autopilot and navigators. Tornado Alley 6 place oxygen system, Tornado Alley Tip tanks. Location is Jandakot, Western Australia. The owner of this Bonanza has spent $A220k on avionics and performance upgrades and it can cruise at 195 TAS at FL 180. This aircraft provides a lot of capability at the right price.
Airframe
Total Time
2,889
Complete Logs
Yes
Engine
Engine 1 Make/Model
CONTINENTAL IO520
Engine Horsepower
212.52 kW
Engine 1 Time
1,236 SMOH
Engine TBO
1700
Aftermarket Engine STC
Yes
Turbonormalised
Yes
Props
Prop Time
58 SNEW
Number of Blades
3
Modifications/Conversions
Modifications/Conversions
Turbo normalised via a system from Tornado Alley fitted 2021. TAS 195 knots at FL180.
Tip Tanks by Tornado Alley
• New tinted windows all round with thickened material for reduced noise in 2020
• GAMI injectors
• New propeller June 2022 Hartzell True Composite 3 blade
• Tornado Alley 6 place O2 system
Avionics
Flight Deck Manufacturer/Model
GARMIN G3X
ADS-B Equipped
Yes
WAAS
Yes
LPV
Yes
Yaw Damper
Yes
Avionics/Radios
o G3X,
o GTN650,
o GFC507 autopilot,
o GTX345 transponder,
o GMA 345 audio panel
o G5,
o GTR225
o Codan HF2000 radio,
Additional Equipment
Oxygen System
Yes
Additional Equipment
Tornado Alley 6 place oxygen system
Interior
Number of Seats
6
Configuration
Passenger

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

