Call for price
Aircraft Location:Fort Lauderdale, Florida, USA
Seller Information
View Seller InformationGeneral
Airframe
Total Time
13,083.1
Total Landings
9,505
Engine Program
Engine 1 Maintenance Program
JSSI
Engine 1
Engine 1 Time
15,044.8 SNEW
Engine 1 TBO
5000
Engine 1 Cycles Since Overhaul
10,624
Hot Section Time 1
2,205.9
Engine 1 Notes
Time Since New: 15,044.8 Hrs
Cycles Since New: 10,624
Time Since Hot Section: 2,205.9
Time since overhaul: 5,418.4
Overhaul Due In: 2.316,6 Hrs
Engine 2
Engine 2 Time
15,298.5 SNEW
Engine 2 TBO
5000
Engine 2 Cycles Since Overhaul
10,776
Hot Section Time 2
1,852.5
Engine 2 Notes
Time Since New: 15,298.5 Hrs
Cycles Since New: 10,776
Time Since Hot Section: 1,852.5
Time since overhaul: 5,746.6
Overhaul Due In: 1.953.4 Hrs
Avionics
ADS-B Equipped
Yes
Avionics/Radios
Collins WXR-840 Radar
Collins ALT-55 Radio Altimeter
Honeywell MK V EGPWS
ADS-B (STC ST11216DS)
Collins TCASII TTR-920 Version 7.0
Dual Universal UNS1E FMS
Universal CVR-30B CVR
Dual Collins VHF 422A Comms
Airshow 400
Dual Collins ADF-462
KGS 60Hz 1200VA Inverter
Dual Collins FCS 850 Autopilot
King KTR-953 HF
Additional Equipment
Wifi
Yes
Additional Equipment
Artex 406 MHz ELT ATG-2000 WiFi
Carbon Fiber Engine Inlets
Exterior
Year Painted
2016
Interior
Year Interior
2022
Inspection Status
Inspection Status
Phase A: C/W on April,2024 at 13,007.3 Hours
Phase B: C/W on September, 2024 at 13,034.8 Hours
Phase C: C/W on September,2022 at 12,442.6 Hours
Phase D: C/W on August, 2019 at 10,855.9 Hours
12 Year: C/W on February, 2022 at 11,994 Hours
Landing Gear: C/W on April, 2014 at 8,837.7 Hours & 6,267 Landings
Specifications Subject To Verification Upon Inspection. Aircraft Subject To Prior Sale or Withdrawal From Market.

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

