£212,205
Aircraft Location:Fort Smith, Northwest Territories, Canada
Seller Information
View Seller InformationGeneral
Year
1979
Manufacturer
Model
Registration #
C-GAIX
Serial Number
18503890
Condition
Used
Based at
CYSM
Total Time
16,965.7
Description
This 1979 Cessna A185F is commercially operated and freshly overhauled engine. Equipped with Wipline 3730 amphibious floats, a Robertson STOL kit, and Flint Aero extended range tip tanks. Features SkyTrac tracking, Garmin avionics, and full dual controls. Contact Airside for more information.
Engine 1
Engine 1 Make/Model
CONTINENTAL IO520F
Engine 1 Time
0 SMOH
Engine 1 TBO
1900
Engine Specs
Overhauled January 9, 2025
Props
Prop Specs
Make/Model: Hartzell HC-C3YF-1RF/F8429
Time: 575.4 SNEW
Installed May, 21, 2020
Avionics
Avionics/Radios
Standard Equipment:ASI, ADI (GH), ALT, CDI, TC (DC Electric), DG, VSI,Clock, Mag Compass, Ammeter, Fuel Gauge, Manifold PSI/Fuel Flow, Engine Tachometer, Vacuum
King KMA 20 Audio Panel
King KX 175B NAV/COMM 1
King KY 92 COMM 2
King KI 209 ILS/NAV Indicator
Garmin MAP 196 GPS
Garmin GTX 327 Transponder
Trans-Cal Blind Encoder
Electronics International CHT/EGT & Oil PSI
SkyTrac DSAT-200 Tracking System
Kannad 406AF ELT & Remote
True Blue USB Charger
Additional Equipment
Additional Equipment
Robertson STOL Kit
Wipline 3730 Amphibious Floats
Flint Aero Extended Range Fuel Tip Tanks
External Loads STC (Floats/Amphibs)
Wipline 3000 Series Skis
Shoulder Harness Kit (SK185-52B, Cessna SEB92-88)
Secondary Seat Stop (SK210-174 Kit, Cessna SEB07-5)
Seaplane Ventral Fin Kit
Horizontal Stabilizer Abrasion Boots
SoundEx Thermal/Acoustic Cabin Insulation Kit
Full Dual Controls (RH Pilot)
Articulating LH Pilot Seat
Ground Power Receptacle

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

