£153,820
£153,820 + GST = GBP £169,202 (GST applies to buyers in Australia)
Aircraft Location:Hallett, South Australia, Australia
Seller Information
View Seller InformationGeneral
Year
2022
Manufacturer
Model
Registration #
23-2050
Serial Number
216
Condition
Used
Total Time
52
Description
2022 P2008 Tecnam, low hours.
Located at Hallett (200kms North of Adelaide at OZTVE)
Nil accident history, full records, Maintained by Propelled Aviation LAME from Murray Bridge SA, owned & flown by an experienced ex Commercial Pilot and always hangered since new and in as new condition.
Price is AUD $320,000 (plus GST) or nearest reasonable offer
Note: Tecnam Australia - Replacement Cost Well Over $415,000
For any questions or enquiries, reach out either via phone or email.
Airframe
Airframe
Colour Special Paint - White with Blue belly & Metallic Silver stripes.
Engine
Engine Specs
Rotax 912 ULS 100hp, SN 9144669, Maintained by LAME, 100 hrly due on TBA .
Props
Prop Specs
MT Hydraulic CSU Prop SN 221402.
Avionics
Avionics/Radios
GMA 240 Audio Panel, GTR 200 Com, GTX35R Mode S Transponder, Garmin GTX 45R Transponder Mode ADSB In/Out, GME UHF Radio (installed thru audio box), RAM mount on Lt panel.
Additional Equipment
Additional Equipment
x2 Garmin G3X Screens, x2 GDU 460 with EIS, ADAHRS GSU 25, GEA 24 Engine Instrument Module, GMU 22 Magnetometer, GA 56 GPS Antenna, GTP Temp Probe, LRU Kit, G3X Sensor Kit, GSU Configuration, Amps, CHT, Bus Voltage, Oil Temp, Oil Pressure, Manifold Pressure, RPM, Trim Indicator, LH & RH Fuel Gauges, Auto-Pilot 2 Axis with GMC 307 Auto-pilot Mode Controller, GAP 26 Heated AOA Pitot, Fuel Transducer for G3X, Wheel Pants, ELB, Unused Tecnam Fuselage Cover, New Towbar

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

