£203,558
£203,558 + VAT = GBP £234,092 (VAT applies to buyers in South Africa)
Aircraft Location:Johannesburg, Gauteng, South Africa
Seller Information
View Seller InformationGeneral
Year
1979
Manufacturer
Model
Condition
Used
Description
The Cessna 210 Centurion is a six-seat, single-engine, piston aircraft that was first flown in January 1957 and produced by Cessna. It entered the market in 1960.
This model was designed similarly to the Cessna 182 but includes retractable landing gear, a swept tail, a new wing, and a hydraulic gear system. The fuselage was extended and made wider, while the flaps were extended to allow for a decreased landing speed.
The Cessna 210 was produced until 1986, and a total of 575 were built.
GTN 750
GTX 327 TRANSPONDER
KANNAD ELT
NO KNOWN DAMAGE HISTORY
Airframe
Total Time
5,020
Engine
Engine 1 Make/Model
CONTINENTAL IO520L
Engine 1 Time
1,286 SMOH
Engine TBO
1700
Props
Number of Blades
3
Prop Specs
Hartzell 3 Blade Propeller
• Time Since New: 2,840 Hrs
• Time Between Overhaul: 2,400 Hrs
• Time Since Overhaul: 72 Hrs
• Date Last Overhaul: July 2023
• Half Life Inspection Due: 2028
• 5 Year Propeller Due Date: July 2029
Avionics
Avionics/Radios
• Audio Panel: Garmin GMA 35
• GPS 1: Garmin GTN 750 touch screen with integrated terrain and weather. Software updated in July 2023
• GPS 2: Garmin GNS 430 with integrated terrain.Software updated July 2023
• DME: King KN 62A TSO
• ADF: King KR 87 TSO
• Transponder: Garmin GTX 327
• Weather: Stormscope WX 500 Series II Intergrated with GTN 750
• ELT: Kannad AF Integra with built-in GPS and RC200 Remote Panel
• Engine: JPI Instruments EDM 700-6C with Fuel Flow
Exterior
Year Painted
2005
Interior
Year Interior
2023

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

