£71,201
Aircraft Location:Upland, California, USA
Seller Information
View Seller InformationGeneral
Year
1978
Manufacturer
Model
Condition
Used
Registration #
N4247H
Description
1978 Mooney M20J 201 with 3981 Total Time. Lycoming IO-360-A3B6D with 1863 TSMO. No Damage History, Well Maintained, Complete Logs, Always Hangered, Second Owner Aircraft and Flown Regularly. Hangered in Southern California at Fullerton Airport. Modern Composite Wingtips, Including new Windshield and Side Windows. Installed Speed Mods and Improved Cabin Insulation all installed by LASAR.
Airframe
Total Time
3,981
Useful Load
452.69 kg
Airframe
1978 Mooney M20J 201 with 3981 Total Time. Annual Inspection Completed May 2026. No Damage History, Always Hangered, and Flown Regularly. Second Owner Aircraft, Owner has owned for 45 Years. Paint and Interior original, but in Fair Condition. Front Seats have Sheepskin Covers. Installed Precise Flight Stand-By vacuum System, Brackett Air Filter, and Bruce’s Custom Cover.
Engine
Engine 1 Make/Model
LYCOMING IO-360-A3B6D
Engine 1 Time
1,863 SMOH
Engine TBO
2000
Engine Specs
Lycoming 200 HP IO-360-A3B6D with 1863 Hour Since Overhaul from Firewall Forward
Compression 1) 70/80 2) 76/80 3) 76/80 4) 77/80
Props
Prop Specs
Overhauled 223 TSMO with Polished Spinner
Avionics
Avionics/Radios
Garmin GTX-345 Transponder With GPS, Bluetooth, with ADSB IN/OUT
King KX-170B Nav/Comm w/Localizer
King KNS-80 Nav w/Localizer and Glideslope
King KY-92 Comm
King KMA-24 Audio Panel
Edo-Aire Century II 2 Axis Autopilot
Exterior
Year Painted
1978
Exterior
1978 Original in Fair Condition
Interior
Year Interior
1978
Interior
1978 Fair Condition. Front Seats have Sheepskin Covers.
Service Logs

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

