£147,054
Aircraft Location:Placerville, California, USA
Seller Information
View Seller InformationGeneral
Year
1966
Manufacturer
Model
Serial Number
D8126
Registration #
N109Q
Condition
Used
Based at
KPVF
Description
Complete logs, No hail. Early damage in the 70's. No corrosion. 285 HP injected Continental Factory reman' burning 12 gallons in cruise.
Airframe
Total Time
4,806
Useful Load
446.79 kg
Complete Logs
Yes
Engine
Engine 1 Time
72 SFRM
Engine TBO
1700
Engine Specs
Engine Time: 72 SFREM on IO-520 BB Continental with 1700 TBO
Props
Prop Specs
Prop Time: 70 SPOH on McCauley three blade
Avionics
Avionics/Radios
King KMA 24 Audio Panel with 3LMD
Garmin GNS 530W color IFR moving map GPS/Com
Garmin GI 209 Glide slope/VOR/Localizer indicator
King KX 155 digital 760 channel flip/flop Nav/com
King KI 209 Glide slope/VOR/Localizer indicator
Garmin GTX 330 Transponder with Traffic
Garmin GDL 82 ADSB in and out
S-Tec 50 autopilot with Alt Hold
GPS Steering
Century HSI
EDM 700 graphic six cylinder engine analyzer
Hoskins fuel flow
Davton digital VOR readout
David Clark intercom
Davtorn digital OAT, temp Dens' alt etc
Digital Timer
Dual yoke mounted drilled push-to-talk buttons
Hamilton Vertical card compass
Double yoke
Electric trim
Remote AP Disconnect
Exterior
Exterior
Overall bright white with Burgundy blue major accent and gold minor accent in very traditional Beech scheme. Rated 9 out of 10.
Interior
Interior
Tan leather seats with headrests, matching side panels and carpet. Cream headliner. Sheepskins on front seats. Overall rated 9 out of 10.
Inspection Status
Inspection Status
Annual Due: October 2026
Airworthy
Yes

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

