£218,218
£218,218 + VAT = GBP £250,951 (VAT applies to buyers in South Africa)
Aircraft Location:Johannesburg, Gauteng, South Africa
Seller Information
View Seller InformationGeneral
Year
1989
Manufacturer
Model
Condition
Used
Description
The 1989 F33A Bonanza is a versatile single-engine aircraft powered by a Continental IO-520-B engine, known for its speed and capability as a four or six-seater. It features a conventional “straight” tail, a spacious cabin, and can achieve a maximum cruise speed of around 182 knots.
Highlights:
LOW TIME AIRCRAFT
NO DAMAGE HISTORY
ENGINE WITHIN THE 12 YEAR ENGINE RULE (2019)
NEW WINDOWS
Airframe
Total Time
1,872
Engine
Engine 1 Make/Model
CONTINENTAL IO520BB
Engine Horsepower
285 kW
Engine 1 Time
173 SMOH
Engine TBO
1700
Year Engine Overhauled or Installed as New
2019
Engine Specs
Time Since New: 1,872 Hrs
Props
Prop Manufacturer
HARTZELL
Prop Time
1872 SNEW
Number of Blades
3
Prop Specs
Last Overhaul: 2019/12/10
Midlife inspection done: 850 Hrs - next due 2029/06/13
MPI done: 2025/08/14 - next due 2026/08/13
Avionics
Avionics/Radios
• King KMA20 : Audio Panel
• GARMIN GPS 400: GPS
• Dual King KX155 : NAV/COMM
• JPI EDM 830 : Engine Monitor
• King KFC200 : Autopilot / Flight Director
• King KN63 : DME
• King KR87 : ADF
• BFG WX900 : Stormscope
• King KT76A : Transponder
• Intercom
• ARTEX : ELT
Additional Equipment
Additional Equipment
• Wing Bolts Inspections done 2021/01/21
• CSU Done 2024/06/13
• New windows
Exterior
Exterior
• Overall white with grey and blue accents 6/10
Interior
Number of Seats
6
Configuration
Passenger
Interior
• No. of Passengers: 1+5
• Original blue leather interior with matching carpets 6/10

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

