£321,602
Aircraft Location:Palatine, Illinois, USA
Seller Information
View Seller InformationGeneral
Year
1978
Manufacturer
Model
Serial Number
402
Registration #
N123NP
Condition
Used
Description
Reduced Price! 6,484 Hours Total Time, Dual Garmin GTN-750Xi's, Dual Garmin GI-275's, Garmin GFC-600 Autopilot, ADS-B Compliant, WAAS, Known Ice, Cleveland wheels and Brakes, Vortex Generator and more!
Airframe
Total Time
6,484
Engine 1
Engine 1 Make/Model
CONTINENTAL GTSIO520L
Engine 1 Serial Number
292337R
Engine 1 Time
788 SMOH
Engine 1 TBO
1600
Engine 2
Engine 2 Make/Model
CONTINENTAL GTSIO520L
Engine 2 Serial Number
292337R
Engine 2 Time
788 SMOH
Engine 2 TBO
1600
Props
Prop 1 Manufacturer
MCCAULEY
Prop 1 Time
788 SMOH
Prop 2 Manufacturer
MCCAULEY
Prop 2 Time
788 SMOH
Modifications/Conversions
Vortex Generators
Yes
Avionics
ADS-B Equipped
Yes
WAAS
Yes
Avionics/Radios
Electronic Flight Instrument System: Dual Garmin GI-275
Autopilot: Garmin GFC-600
COM/NAV/GPS/MFD: Dual Garmin GTN-750Xi
Audio Panel: Garmin GMA-35C
GPS Antennas: Dual Garmin GA-35 WAAS
Transponder: Garmin GTX-345
Additional Equipment
Additional Equipment
New Co-Pilot Windshields
New GI-275's Installed on Pilot and Co-Pilot Sides
ADS-B Compliant
WAAS
Flight Stream 510
Known Ice
Bose Headsets
Lead Acid Battery
Spoiler/Speed Brake
Cleveland Wheels and Brakes
Engine Fire Detection
Glass Windshield
Vortex Generator
Exterior
Exterior Notes
Overall White with Silver and Blue Stripes.
Interior
Year Interior
2024
Number of Seats
7
Interior Notes
Seven passenger interior consisting of four-place club configuration, single aft forward facing seat and two crew seats. Dual executive writing tables. New interior 2024.

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

