£2,176,739
Aircraft Location:Latrobe, Pennsylvania, USA
Seller Information
View Seller InformationGeneral
Year
2002
Manufacturer
Model
Condition
Used
Based at
KLBE
Description
Centennial Jets is proud to present this exceptional 2002 Cessna Citation Encore, a proven performer in the light jet category offering impressive speed, strong runway performance, and efficient operating economics.
This aircraft was previously operated under Part 135, reflecting a professionally maintained pedigree and structured maintenance history. The current owner has taken excellent care of this professionally managed plane and has spared no expense in its care and maintenance. Owner is upgrading to a larger aircraft, creating a strong acquisition opportunity for the next operator.
This aircraft is based out of its hangar in the Pittsburgh, Pennsylvania Area
The Citation Encore is widely regarded as one of the most balanced light jets in its class. Powered by the PW535A engines, it offers strong climb performance, efficient cruise speeds, and the ability to access shorter runways while maintaining true business jet capability. Ideal for sub-1,500 NM missions, Excellent short-field capability and Efficient operating profile.
With its professional operating history and consistent care, this Encore presents as an excellent flying aircraft , stable, responsive, and mission-ready.
Aircraft Highlights:
- Airframe Total Time: 12,313 Hours
- Engines: Pratt & Whitney PW535A (1,990 SMOH each)
- Ceramic Coating
Airframe
Total Time
12,313
Engine Program
Engine 1 Maintenance Program
JSSI
Engine 1
Engine 1 Make/Model
PRATT & WHITNEY PW535A
Engine 1 Time
1,990 SMOH
Engine 2
Engine 2 Make/Model
PRATT & WHITNEY PW535A
Engine 2 Time
1,990 SMOH

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

