£142,322
Aircraft Location:Lincoln, California, USA
Seller Information
View Seller InformationGeneral
Year
1976
Manufacturer
Model
Serial Number
E-896
Registration #
N2141L
Condition
Used
Description
1976 Beechcraft A36 Bonanza located in Alta Sierra, CA (09CL) and always hangared. Well-cared-for airframe with 2,522 TT and a Continental IO-520. McCauley prop has 151 hours since overhaul (2008). Aircraft features a classic Collins/King avionics suite including KFC 200 autopilot, ADS-B Out via uAvionix TailBeacon, and Mode C transponder. Paint presents very nicely (8/10) and interior is clean and comfortable. Fresh annual completed June 2025, pitot/static July 2025, no known damage history, and complete logs since new.
Airframe
Total Time
2,522
Complete Logs
Yes
Airframe
• Annual completed June 2025
• No known damage history
• Complete logs
• Pitot/Static test complete July of 2025
• Same owner for 40 years!
Engine
Engine 1 Make/Model
CONTINENTAL IO520BA
Engine 1 Time
1,396 SFRM
Engine TBO
1700
Engine Specs
Engine Details:
Continental I0520BA (TBO 1700hrs)
SN#: 429354R (Factory Rebuilt 1985)
Props
Prop Manufacturer
MCCAULEY
Prop Time
151 SOH
Prop Specs
Model: McCauley D3A32C76-SMR
SN# 796981
Overhauled in 2008
Avionics
Avionics/Radios
• Collins AMR 35D Audio Panel
• 2x Collins VHF 251 COM Radios
• 2x Collins VIR 351 NAV Radios
• Collins TDR 950 Transponder (Mode C)
• ARNAV Star 5000 VFR GPS coupled to A/P
• Collins 650 ADF
• King KFC 200 A/P
• King KI 525 HSI
• NAT RS08-001 Intercom
• ACK 406Mhz ELT
• Alcor EGT
• uAvionix Tail Beacon (ADSB Out)
Exterior
Exterior
Paint – Overall White Grey and Blue Stripes (8/10).
Interior
Interior
Interior – Blue/Brown seats (7/10).

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

